Similar Projects
South Hartford Conveyance and Storage Tunnel - Tunnel Pump Station Contract No. 3
New Construction
Bidding
Hartford, CT

Provision and Installation of a Prefabricated Pump Station
Post-Bid
Groton, CT 06340

Construction of Stormwater Pumping Station, Stratford, CT
Post-Bid
$5,000,000 to $10,000,000 est. value
Stratford, CT

Wastewater Pump Stations Rehabilitation Project
Renovation
Results
Stafford, CT 06615

Easton Turnpike Pump Station and Force Main Replacement
Results
Fairfield, CT 06824

Evergreen Avenue Sewer Pump Station Supply and Installation of Fourth Pump
Infrastructure
Post-Bid
Waterford, CT 06385

Steele Street Pump Station Modifications
Renovation
Results
Less than $443,700 est. value
New Britain, CT

Woodruff Hill Sanitary Sewage Pump Station at E. Commerce Drive
New Construction
Post-Bid
Oxford, CT

Route 133 Pump Station Improvements
Results
Brookfield, CT

Construction Of The Old Lyme Shared Sewer Infrastructure At Pump Station
New Construction
Post-Bid
Manchester, CT

Construction of Raymark Stormwater Pumping Station, Stratford, Ct
Results
Stratford, CT

Old Lyme Associations Pump Station
New Construction
Post-Bid
Old Lyme, CT

Gulf Street Sanitary Pump Station Repairs
Results
Milford, CT 06460

Wet Well Ventilation Upgrades for Gravel Street Pump Station
Results
Mystic, CT 06355

Goss Cove Pump Station Improvements
Results
Groton, CT 06340

Last Updated 10/13/2021 09:09 AM
Project Title

Riverdale Farms Sanitary Sewer Pump Station Upgrades

Physical Address View project details and contacts
City, State (County) Avon, CT 06001   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,633
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents