Similar Projects
Coachman Estates Pump Station Replacement
Renovation
Bidding
Greenville, SC

Pebble Creek Find-and-Fix CIPP Project
Post-Bid
Less than $2,000,000 est. value
Greenville, SC 29605

Wastewater Flow Metering Services
Term Contract
Post-Bid
Greenville, SC 29602

Antioch Branch Sewer Extension Project
Results
Less than $1,300,000 est. value
Greenville, SC

Dunwoody Oaks Pump Station Elimination
Results
Greenville, SC

Woodside Mill Village Sewer Relocation
Post-Bid
Greenville, SC

Unity Park Trunk Sewer Project
Results
$9,053,150 est. value
Greenville, SC

2021 Annual Maintenance Contract
Post-Bid
Greenville, SC

Grease Trap - Grease Interceptor Servicing - District Wide Multi-Year Contract
Term Contract
Results
$19,300 est. value
Fort Mill, SC

Travelers Rest Regional Pump Station
Renovation
Post-Bid
Greenville, SC

South Greenville Enterprise Park Pump Station
Results
Greenville, SC 29673

Burger King Pump Station Replacement
Results
Greenville, SC 29607

Basin Phase 1 CIPP Lining Project
Results
Less than $893,358 est. value
Greenville, SC

RMF Sanitary Sewer Extension
Results
Greenville, SC

Pelham WRRF Process Improvements Phase I
Results
Greenville, SC 29607

Last Updated 08/11/2021 10:44 AM
Project Title

Pine Forest Pump Station Elimination

Physical Address View project details and contacts
City, State (County) Greenville, SC   (Greenville County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of approximately 422 LF of new 8-inch gravity sewer lines, the abandonment of approximately 406 LF of 8-inch sewer lines and the abandonment of an existing pump station. Work includes the installation of approximately 56 LF of open cut encasement. All work will be completed in SCDOT & County right-of way’s and the Owner’s easements.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents