Similar Projects
Last Updated 11/10/2020 11:22 AM
Project Title

Angerer Road Slope Stabilization Project

Physical Address View project details and contacts
City, State (County) Cecil, PA 15317   (Washington County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bid No. 1 Soldier Pile and Lagging Wall This project involves slope and shoulder stabilization and rehabilitation including, but not limited to, site mobilization and demobilization; the installation of a soldier pile and lagging retaining wall; site clearing; unclassified excavation, and removal of existing scarp; erosion and sediment control devices; all required testing; site cleanup and restoration; site photography and all other items incidental to the proposed construction, complete in place. Bid No. 2 Soil Nail Wall This project involves slope and shoulder stabilization and rehabilitation including, but not limited to, site mobilization and demobilization; the design and installation of a soil nail retaining wall; site clearing; unclassified excavation, and removal of existing scarp; erosion and sediment control devices; all required testing; site cleanup and restoration; site photography and all other items incidental to the proposed construction, complete in place. Traffic Control and Bituminous Repair Bid No. 1 Single Lane Closure This item involves a 24-hour, self-regulating, single lane closure of Angerer Road for the duration of the project and includes all materials, labor and equipment to complete in place. Traffic Control and Bituminous Repair Bid No. 2 Road Closure and Detour Road This item involves a 24-hour, full lane closure of Angerer Road for the duration of the project with establishment of a detour route and includes all materials, labor and equipment to complete in place. Add Alternate No. 1 Stormwater Controls and Shoulder Stabilization This item involves the procurement and installation of an inlet and storm sewer piping to tie into an existing inlet box; site clearing; unclassified excavation and fine grading; crushed limestone backfill placement for slope stabilization; erosion and sediment control devices; all required testing; site cleanup and restoration and all other items incidental to the proposed construction, complete in place.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents