Similar Projects
Fish Dam Creek Crossing - Bridge/ Culvert
Bidding
MI

Hog Island Creek Crossing - Bridge Replacement
Bidding
MI

Huckleberry Trestle 2 Railroad Bridge Replacement
Post-Bid
Less than $100,000 est. value
Flint, MI

Camp Petosega Construction Services Pedestrian Bridge Replacement
Post-Bid
Petoskey, MI

802 Fa (Bridge and Special Structures), and Sub N9-6L (Guardrail) or 802 Ea (Grading, Drainage Structures, and Aggregate Construction), and Sub N9-6L (Guardrail)
Results
MI

Lake Pleasant Road Bridge Replacement
Results
Less than $772,055 est. value
Hillsdale, MI

MI-TRALE - Bergland Multi-Use ORV Bridge Project
New Construction - 2,000 SF
Construction
$125,000 est. value
Bergland, MI

Land Improvement Building Number 1009965 Matthaei Botanical Gardens - Radrick Bridge Repairs Bidpack 01 - Construction
Post-Bid
Ann Arbor, MI 48105

Bridge Rehabilitation Including Epoxy Overlay, Partial Concrete Deck, Backwall, Substructure Repair, Construction Joint Replacement
Results
MI

Island Park Fitness Trail and Pedestrian Bridge
Post-Bid
Mount Pleasant, MI

Bridge Rehabilitation of 4 Structures Including Epoxy Overlay, Substructure, Superstructure and Beam Repair, Joint Replacement, Barrier Replacement and approach Work
Results
MI

Capital Bridge Preventative Maintenance Project
Post-Bid
Ann Arbor, MI

Bridge Removal and Replacement of 3 Structures With 42"X49" Bulb-Tee Beams, 44" Continuous Plate Girders
Results
Detroit, MI 48204

Cheese Factory Bridge Superstructure Removal
Post-Bid
Iron Mountain, MI

Deer Creek Bridge Replacement
Results
Less than $163,000 est. value
Harvey, MI 49855

Last Updated 12/13/2019 08:22 AM
Project Title

RAA Sand Plains Railcar Bridge Replacement

Physical Address View project details and contacts
City, State (County) Gwinn, MI   (Marquette County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $374,358
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and demolish the existing 12’ wide x 41’ long steel railcar bridge superstructure and replace it with a new 14’ wide x 50’ long prefabricated steel bridge. Work consists of providing new auger cast piles, a concrete pile cap and deadman to support the new bridge loads, a drainage layer of stone beneath/around the new concrete foundations, additional riprap within the stream to protect the existing abutments to remain, excavation and fill as necessary for the new foundations, new approach gravel to the bridge, approach railings, and slope restoration. The new bridge will be self weathering steel with a timber deck wear surface and steel guardrails. The bridge downtime needs to be limited to 6 weeks since it is used to access property owned by others

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents