Similar Projects
Pine Ridge Elementary School New Administration Building
New Construction
Conception
$3,300,000 est. value
Magalia, CA 95954

Paradise High School Science Room & Library Renovation
Renovation
Conception
$7,000,000 est. value
Paradise, CA 95969

Pine Ridge Elementary School Class Room Renovation
New Construction, Renovation, Addition - 34,200 SF
Design
$5,400,000 est. value
Magalia, CA 95954

Public Health Storage Building Procurement and Construction Project
New Construction, Infrastructure - 3,000 SF
Bidding
$1,144,306 CJ est. value
Oroville, CA 95965

Administration / Classroom Building and Library / Science Building Furniture for Paradise High School Building
Renovation
Bidding
$3,700,000 CJ est. value
Paradise, CA 95969

Paradise High Science Rooms Remodel & Library Remodel
Renovation
Post-Bid
$6,940,621 est. value
Paradise, CA 95969

Manzanita Elementary School Modernization
Renovation
Post-Bid
Gridley, CA 95948

Improvements to the Grounds Maintenance Building Project
Renovation
Results
$2,250,000 est. value
Thermalito, CA 95965

Berry Brush Stewardship IRSC (Fire Salvage) (rebid)
Infrastructure
Results
CA

Paradise Junior High Modernization Classrooms & Steam Lab
Renovation, Addition
Construction
$9,200,000 est. value
Paradise, CA 95969

Paradise High School Building Modernization Building 400 & 500
Renovation, Addition
Conception
$2,000,000 est. value
Paradise, CA 95969

Bald Rock Road Rehabilitation
Infrastructure
Bidding
$3,200,000 CJ est. value
Berry Creek, CA 95916

Design-Build Services - Durham Intermediate School New Building(S) Project
Renovation
Post-Bid
$700,000 est. value
Durham, CA 95938

Paradise Irrigation District (PID) Reservoir B Replacement Project
Infrastructure
Results
$8,653,500 CJ est. value
Paradise, CA 95969

Paradise High School Wrestling Room Renovation
Renovation
Conception
$1,400,000 est. value
Paradise, CA 95969

Last Updated 07/29/2022 09:38 AM
Project Title

Lease-leaseback Project for the New Maintenance and Operation Building

Physical Address View project details and contacts
City, State (County) Oroville, CA 95965   (Butte County)
Category(s) Commercial, Education, Heavy and Highway
Sub-Category(s) Elementary School, Middle/Senior High School, Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

NEW Maintenance & Operation Building Mandatory Skilled & Trained Workforce requirements must be met. This is a Lease-Leaseback project. Work consists of all required labor, material, services, shop drawings, submittals, warranty & closeouts, tax/freight, protection of adjoining work, cleaning, and disposal of own materials. It is the Subcontractors responsibility to know the complete set of plans, to clarify and cover any missing items required to complete their scope of work. The Scope of Work will include: Selective Site Demolition, Site Concrete, Structural Concrete, , Structural Steel Framing, Metal Fabrications, Pipe and Tube Railings, Traffic Coatings, Concrete Floor Sealer, Building Insulation, Steel Doors and Frames, Flush Wood Doors, Access Doors and Frames, Door Hardware, Glazing, , Signage, Specialties, Plumbing, Electrical, Low Voltage / Communications, , Site Clearing, Site Grading, Trenching, Aggregate Base Courses, Asphalt Paving, Striping, Chain-Link Fences and Gates,Site Water Systems, Site Sanitary Sewer, Site Storm Drainage METAL BUILDING SUPPLY BYOWNER Please contact Edgar Ibarra(edgari@unitedbuildingcontractors.com)if you plan to bid this project orhave any questions byemail or contact them by phone.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Hardware, Door Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Furniture, Office Furniture, Institutional Furniture, Classroom Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents