Similar Projects
Submersible Pumps and Wastewater Lift Stations
New Construction
Bidding
Cocoa, FL 32922

Lift Station, Grease Trap and Septic Tank Pump and Maintenance
Term Contract
Results
Less than $300,000 est. value
Viera, FL 32940

Repair Lift Station Pumps Bldgs. 650 and 1497 & Replace Lift Station Bldg. 943, Patrick AFB, FL
Results
$1,000,000 to $5,000,000 est. value
Patrick AFB, FL 32925

Lift Station 93 Rehabilitation
Results
Less than $106,966 est. value
Palm Bay, FL 32909

Lift Station and Force Main C-01 Replacement
Results
$547,000 est. value
Merritt Island, FL 32953

Intermediate Pump Station Improvements
Results
$457,300 est. value
Cape Canaveral, FL 32920

Lift Station #3 Rehabilitation
Results
$340,000 est. value
Cape Canaveral, FL 32920

Marina Lift Station Improvements
Results
Less than $522,000 est. value
Titusville, FL 32796

Lift Station 43 Rehabilitation
Results
Palm Bay, FL 32907

Lift Stations J-03, J-04, and J-05 Rehabilitation
Results
Port Saint John, FL 32927

Lift Station S-21 Rehabilitation
Results
$60,216 est. value
Viera, FL 32940

Rehabilitation of Brevard County Lift Station M-17 and V-11
Results
$196,930 est. value
Merritt Island, FL 32952

Lift Station T-09 Rehabilitation
Results
Viera, FL 32940

Lift Station N-01 Replacement
Results
$544,090 est. value
Viera, FL 32940

Hall Road Pump Station
New Construction
Results
$1,722,320 est. value
Merritt Island, FL 32953

Last Updated 03/02/2020 11:12 PM
Project Title

Lift Station No. 11 Replacement Young Street

Physical Address View project details and contacts
City, State (County) Melbourne, FL 32901   (Brevard County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Pump and Control Panel Supplier usually supplies the duplex submersible pump package and the associated control panel. This includes, but is not necessarily limited to, the following: 1. (3) submersible sewage pumps and adequately sized motor cables 2. (3) discharge elbows with anchor bolts 3. (3) sets of stainless steel guide rails and associated guide rail brackets 4. (4) “Roto” floats and associated float brackets 5. (1) set of aluminum hatch covers for wet well and valve vault 6. (3) stainless steel lifting cable chain and associated hardware 7. (1) control panel and component package which includes Data Flow Systems Pump Control Unit (PCU) and unattached generator receptacle. 8. (1) start up services and manufacturer’s acceptance of pump and panel installation as it pertains to pump and panel warranties (this includes all pertinent manuals and printed warranty information). Project Location: The project site is the existing Lift Station No. 11 site located just east of the Young Street and Sunny Point Drive intersection in Melbourne, Florida (Section 21, Township 27 South, Range 37 East).

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents