Similar Projects
Last Updated | 11/01/2021 01:06 PM |
Project Title | Yazoo River Basin, Rocky Bayou, Yazoo Backwater Project, PL 116-20, Rocky Bayou Bank Stabilization |
Physical Address | View project details and contacts |
City, State (County) | Yazoo City, MS 39194 (Yazoo County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Shoreline/Erosion/Drainage |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $1,000,000 to $5,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work consists of furnishing all plant, labor, materials and equipment, and performing all work in strict accordance with the specifications, drawings, and schedules. Principal features of work include clearing, grubbing, debris removal, excavation and grading, erosion control, storm water pollution prevention and all other work associated with constructing the longitudinal peaked stone dikes, transverse stone dikes and stone tiebacks and stone paving at the locations shown on the drawings, on the banks and channel of O'Neil Creek in the vicinity of Yazoo County, Mississippi, within a relatively short construction period. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |