Similar Projects
4410--Diagnose and Repair Boiler Safety Devices
Post-Bid
Phoenix, AZ

J041--644 Boiler Water Treatment
Post-Bid
Phoenix, AZ 85012

Qualified Select Bidders List / HVAC Mechanical Yard - Lomas Elementary
Term Contract
Results
Phoenix, AZ 85044

Citywide Mechanical and Plumbing Contracting Services JOC
Term Contract
Results
$5,000,000 est. value
Scottsdale, AZ

4410--644 Survey Design Install Boiler Quick Connects
Term Contract
Post-Bid
Phoenix, AZ 85012

Carson JR High School P.E. Hot Water Boiler Replacement
Results
Mesa, AZ 85201

4410--644 Temporary Boiler
Term Contract
Post-Bid
Phoenix, AZ 85012

Boiler Maintenance and Repair Services
Term Contract
Results
Phoenix, AZ

4410--644 Survey Design Install Boiler Emergency/ Auxiliary Connection
Term Contract
Post-Bid
Phoenix, AZ 85012

Dual Pump Condensate Tank Unit Replacement/Installation
Term Contract
Results
Phoenix, AZ 85004

Dobson High School Girls PE Boiler Replacement
Alteration
Post-Bid
Mesa, AZ 85202

Highland Elementary School Central Plant Upgrades
Term Contract
Results
$1,200,000 est. value
Mesa, AZ 85213

Annual Inspection and Service To Boilers and Chillers, USDA Maricopa, AZ
Term Contract
Post-Bid
Maricopa, AZ

City Fountain Maintenance Services
Alteration
Results
Avondale, AZ 85323

Electrical and Mechanical Services
Alteration
Results
Goodyear, AZ

Last Updated 04/05/2022 09:35 AM
Project Title

H345--644-Boiler End of Life Study

Physical Address View project details and contacts
City, State (County) Phoenix, AZ 85012   (Maricopa County)
Category(s) Single Trades
Sub-Category(s) Mechanical
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor to assess the state of the facility’s boiler, deaerator, and condensate tank integrity and perform end of life study. The contractor shall supply all personnel, labor, material and equipment to inspect and test the boilers and ancillary equipment. The contractor shall provide a complete written report fully describing all inspections and tests performed, findings, and recommendations. The condition of all items inspected shall be stated whether acceptable or deficient. Provide calculations for remaining life based on calculated present maximum allowable working pressure vs. original maximum allowable working pressure when the boiler was new. Show locations and extent of all non-destructive testing by sketches.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Heating Boilers.
Division 42 - Process Heating, Cooling, and Drying Equipment, Process Boilers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents