Last Updated | 08/25/2020 02:57 PM |
Project Title | Eastmark Phase XV Roadway Improvements (DU3/4N) |
Physical Address | View project details and contacts |
City, State (County) | Mesa, AZ 85211 (Maricopa County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $4,800,000 to $5,900,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. S. Ellsworth Road Improvements (S890) - The Project consists of approximately 3,681 linear feet of street improvements to add an additional northbound lane with landscape installed at back of curb to the detached sidewalk and within the raised median. The street improvement limits are from Point Twenty -Two Boulevard to the south to Warner Road to the north. Improvements will include sewer, water, storm drain, dry utilities , concrete curb and gutter, sidewalk, paving, striping, signage, street lights, street sleeves, landscaping and irrigation. Scope of work will include a horizontal bore for SRP 2.5” conduit across Ellsworth Road, just south of Warner Road to tie into the SRP trench and conduit on the west side of Ellsworth Road. 2. S. Eastmark Parkway Phase 2 Improvements, West Half – Sections 1 and 2 (S891 and S895) – The Project consists of approximately 5,155 linear feet of half street improvement to add two southbound lanes with landscape at back of curb to the detached sidewalk. The street improvement limits are from Point Twenty-Two Boulevard to the south to just south of Mesquite Road to the north. Improvements will include manhole and utility adjustments tying into the existing sewer, wat er and storm drain systems constructed as part of the Phase 1 improvements by others. Phase 2 improvements include concrete curb and gutter, sidewalk, pavement, striping, signage, streetlights, traffic signal conduit, landscaping and irrigation. 3. S. Eastmark Parkway West Half Landscape – Section 1 (S896) – The Project consists of landscape in the west half of Eastmark Parkway from back of sidewalk in Section 1. 4. S. Eastmark Parkway West Half Landscape – Section 2 (S897) – The Project consists of landscape in the west half of Eastmark Parkway from back of sidewalk in Section 2. 5. E. Warner Road (S889 ) – The Project consists of approximately 3,688 linear feet of half -street improvements with two lanes, one lane in each direction. Improvements include the installation of potable water, dry utilities , concrete curb and gutter, pavement, signage, striping, streetlights, traffic signal fiber optic, street sleeves, site electrical, landscape, irrigation, and entry monuments. |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |