Similar Projects
Nuview Special Education Playground and Site Work Project - Bid Package 1 General Trades
Infrastructure
Bidding
$300,000 CJ est. value
Nuevo, CA 92567

Julian Hinds Pumping Plant Village Paving
Infrastructure
Bidding
$210,000 CJ est. value
Desert Center, CA 92239

Downtown Visalia Streetlights and Paving Project
Infrastructure, Alteration
Post-Bid

Paloma Wash Pedestrian Bridge Professional Design Services
Alteration
Post-Bid
Menifee, CA

Hemet Concrete Repairs
Alteration
Results
Hemet, Riverside, CA 92507

Shumway Ranch Site Improvements Project (Concrete)
Alteration
Results
$18,600 est. value
Indio, Mountain Center, CA 92201

Storefront Installation Phase 3
Renovation
Bidding
$100,000 CJ est. value
Hemet, CA 92545

Install Rock Slope Protection, Irrigation, Planting, and Access Road
Infrastructure
Post-Bid
$1,700,000 CJ est. value
Riverside, CA 92505

Airport Misc. Stormwater Concrete Improvements
Infrastructure, Alteration
Results
$35,000 est. value
Palm Springs, CA 92262

Ready Mix Concrete Delivery Services
Term Contract
Post-Bid
Perris, CA 92570

Mary Phillips Senior Center Enhancement and Renovation
Renovation - 9,296 SF
Results
$1,286,000 CJ est. value
Temecula, CA 92590

Provide and Install Roller Shades at Monte Vista Middle School
Renovation
Results
$177,725 CJ est. value
San Jacinto, CA 92582

James Street Sewer Extension Project
Infrastructure
Results
$409,310 CJ est. value
Corona, CA 92881

South Recreation Mall - Phase I
Infrastructure
Results
$1,152,000 CJ est. value
Riverside, CA 92521

Valle Vista Library Parking Lot Paving
Infrastructure
Results
$4,747,035 CJ est. value
Hemet, CA 92544

Last Updated 01/27/2023 03:11 PM
Project Title

Damaged Concrete Removal and Replacement at Fire Stations 7 and 8

Physical Address View project details and contacts
City, State (County) Riverside, CA 92522   (Riverside County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Results, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $79,189 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of January 27,2023 , this project has not yet been awarded. The project is expected to be awarded on February 14,2023.** Provide all labor, materials and equipment necessary to remove the identified damaged concrete at each Fire Station and replace with new concrete. NOTE: The scope of work will take place in and around a fully operational Fire Station. The performance of the proposed work cannot impede on the ability of the Fire Crews to respond to calls. Previsions will need to be made with Fire Crews on a daily basis to keep the Fire Station fully functional at all times. Any questions pertaining to this Bid should be directed to the Q&A tab BEFORE 3:00 p.m. PST on November 18, 2022. Project Type Bid Response Types Line Items Type of Award Lump Sum License Requirements A, or B, or C-8, or C-12 Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00%

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents