Similar Projects
Two Legacy West Offices
New Construction - 300,000 SF
Conception
$10,000,000 CJ est. value
Plano, TX

Lamar Boulevard Offices
New Construction - 180,000 SF
Design
$100,000,000 est. value
Austin, TX 78704

McKinney Avenue Development
New Construction
Design
Dallas, TX 75204

Stonebridge Medical Office Building Site Work
New Construction - 90,231 SF
Post-Bid
$750,000 est. value
McKinney, TX 75069

Life Time Fitness
New Construction - 253,000 SF
Post-Bid
$130,000,000 est. value
Shenandoah, TX

Marwaha Group
Renovation - 8,244 SF
Results
$100,000 est. value
Houston, TX 77073

IT Office Additions
Addition
Results
Waco, TX 76710

The Grove Office Complex
New Construction
Construction
$17,500,000 est. value
Austin, TX 78731

Stacy Green
New Construction
Construction
Allen, TX 75013

Cedar Hill Development Phase I
New Construction
Design
$10,000,000 est. value
Cedar Hill, TX 75104

Wesco Office Building
New Construction - 21,835 SF
Construction
$2,400,000 est. value
Austin, TX 78735

Office Building & Parking Garage
New Construction - 240,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75254

Gateway 10 Business Park - Building 2
New Construction
Construction
$5,200,000 est. value
San Antonio, TX 78109

Cedar Maple Office Tower
New Construction - 654,000 SF
Design
$10,000,000 CJ est. value
Dallas, TX 75201

Paradigm Metals Headquarters
New Construction - 100,000 SF
Construction
Hutto, TX 78634

Last Updated 01/06/2020 03:41 PM
Project Title

USACE Galveston Reconfigure Cubicles in Jadwin Building, Galveston, TX

Physical Address View project details and contacts
City, State (County) Galveston, TX 77550   (Galveston County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is a non-personal service contract to remove, relocate and/or construct cubicle offices for Program Management Branch, Dam and Levee Safety Section and Real Estate Division on behalf of U.S. Army Corps of Engineers (USACE) at the Jadwin Building, Fort Point Reservation, 2000 Fort Point Road, Galveston, TX. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. The contractor shall provide all personnel, labor, equipment, supplies, transportation (vehicles), tools, parts/materials, management/supervision, other items, and non-personnel services necessary to perform Jadwin Cubicle Reconfiguration, as defined in this Performance Work Statement (PWS) except as specified in Attachment 1 as government-furnished property. The work in this contract included removal, relocation, shifting and/or construction of cubicles and electrical work with the use of existing cubicle parts. The contractor shall perform to the standards in this contract. All work shall be performed in accordance with (IAW) industry and commercial practices, using commercial/industry standard equipment, materials, supplies and tools. Copies of all required licenses, certificates and Contracting permits shall be provided to the Contracting Officer (KO) prior to the start of the contract performance. The contractor's performance shall be based on the Contract Officer's Representative (COR) and KO evaluation of the results required by the Performance Requirement Summary and not the frequency or method of performance. It is at the contractor's discretion to determine the levels of frequency to attain the level of service at the best value. The Contractor shall comply with applicable federal, regional, state, local laws and commercial standards to include obtaining required licenses, certificates and permits. A competent/qualified technician (reference 1.13) must be present at all times while personnel are working on site.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents