Similar Projects
Last Updated | 10/20/2021 11:22 AM |
Project Title | McComb Water Line Replacement - Phase 3 |
Physical Address | View project details and contacts |
City, State (County) | Bowling Green, OH (Wood County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $807,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | In general, the work consists of the replacement of approximately 2,850 LF of existing 4-inch and 6-inch water mains with 8-inch pipe along N. Liberty Street between E. Oliver Street and E. Cooper Street, as well as along W. Main Street heading west of Rader Road and continuing onto SR 613. Additionally, work includes the replacement of approximately 450 feet of existing 6-inch water main with 6-inch along N. Walnut and approximately 900 feet of existing 4-inch water main with 6-inch along Pleasant Street between Maple Street and W. Cooper Street. The work shall also include new fire hydrants, water services including water meters and meter pits, valves and restoration of disturbed areas. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |