Similar Projects
Contractor - HVAC Repairs
Alteration
Design
$250,000 to $500,000 est. value
Westhampton Beach, NY 11978

HVAC System Replacement
Alteration
Post-Bid
Holbrook, NY 11741

Cath/EP Lab Renovations HVAC Controls
Renovation, Alteration
Post-Bid
Stony Brook, NY 11794

Building Automation System Repairs (Hvac)
Alteration
Results
$250,000 to $500,000 est. value
Shoreham, NY 11786

Cooling Tower Maintenance and Water Treatment
Term Contract
Results
Stony Brook, NY

Air Filters
Term Contract
Post-Bid
NY

On-Call Landfill Administration Buildings HVAC System Maintenance
Term Contract
Results
Yaphank, NY 11980

Hvac Services
Term Contract
Post-Bid
NY

Unit Ventilator Replacement
Alteration
Results
North Babylon, NY 11703

Window Air Conditioning Units
Term Contract
Post-Bid
Lake Ronkonkoma, NY

Replacement of Air-Handlers
Alteration
Results
Smithtown, NY 11787

HVAC Units
Term Contract
Post-Bid
Patchogue, NY

Contracts for Site Work, General Construction, Plumbing, HVAC, Electrical
Term Contract
Results
East Northport, NY

225kW Induction Cogeneration System - Yaphank Jail New Section
Alteration
Post-Bid
Yaphank, NY 11980

James E. Allen Alternative School Roof Top Unit and Unit Ventilator Replacement
Alteration
Results
Wheatley Heights, NY 11798

Last Updated 07/18/2023 04:34 AM
Project Title

Wyandanch Union Free School District Ventilation and Air Conditioning Upgrades at Milton L. Olive Middle School

Physical Address View project details and contacts
City, State (County) Wyandanch, NY 11798   (Suffolk County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Each proposal submitted must be accompanied by a certified check or bid bond, made payable to the "WYANDANCH UNION FREE SCHOOL DISTRICT", in an amount equal to five percent (5%) of the total amount of the bid, as a commitment by the bidder that, if its bid is accepted, it will enter into a contract to perform the work and will execute such further security as may be required for the faithful performance of the contract. A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each Contractor shall coordinate, through the Owner/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Main secondary feeders, power distribution, and instrumentation control wiring. Provide, mount, and install electrical conduit, wire, fittings, boxes, panels, and electrical accessories. 2. Motor control centers, local control stations, transfer switches, power distribution panels, breakers, lights, and switches. 3. Electrical connections (final termination) to all equipment, control panels, ventilating equipment and electrical devices. 4. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 5. Removal of existing components as noted. 6. New secondary feeders, power distribution, and instrumentation control wiring. New electrical conduit, wire, fittings, boxes, panels, and electrical accessories. 7. Final electrical terminations to all control panels, pumping equipment, blowers, HVAC equipment, etc. 8. Wiring connections to all electrical equipment (including equipment furnished by others). 9. Testing, programming and adjusting of all electrical systems. 10. Startup participation for the various equipment and systems of the project. Provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. Provide systems and equipment training for Owner personnel. 11. Project closeout submittals A. Furnish all labor, equipment, materials, tools, means, methods, and incidentals necessary to complete the Work as required by the Contract Documents for this Construction Contract. Each contractor shall coordinate, through the Owner/Engineer, the work of their contract with the work by others. B. This following abbreviated summary is provided in order to briefly describe the work covered by the Contract Documents for this Construction Contract. It is not all inclusive of the work under the Contract. C. The work includes, but is not limited to, the following: 1. Startup participation for the various equipment and systems of the project and provide complete service to troubleshoot and assist manufacturer service representatives in obtaining a completely functional installation. 2. New grilles, registers, duct work, supports and accessories. 3. Louvers and exterior wall openings. 4. New air conditioning systems. 5. New ventilation systems. 6. Equipment supports, dunnage, and structural alterations. 7. Ductwork, piping, valves, fittings, dampers, louvers, etc. 8. Roofing, penetration sealing, and weatherization. 9. Patching, painting, and finishing work. 10. Equipment controls and BMS integration. 11. Testing and balancing of systems. 12. Project closeout submittals. D. All other work shown and specified in the Contract Documents for Contract H.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents