Similar Projects
Des Moines River Basin, Saylorville Lake Roads, Trails and Infrastructure Maintenance IDIQ
Term Contract
Design
$10,000,000 to $25,000,000 est. value

I-80 - Slurry Seal
Infrastructure
Bidding
IA

I-80- PCC Patching
Infrastructure
Bidding

Street Repair Retainer
Term Contract, Infrastructure
Post-Bid
West Des Moines, IA

Middle School Pavement Replacement
Renovation, Infrastructure
Post-Bid
Waukee, IA 50263

Valley Junction Levee Trail Connection
Infrastructure
Results
West Des Moines, IA

Douglas Parkway Extension
Infrastructure
Results
Waukee, IA 50263

2022 Ashworth Road Pavement Patching
Infrastructure
Bidding
$200,000 est. value
Waukee, IA 50263

Ute Avenue and Ashworth Road Intersection Improvement
Infrastructure
Results
$5,485,000 est. value
Waukee, IA

Waukee Street Resurfacing, Ashworth Drive and Waco Place
Infrastructure
Results
Waukee, IA 50263

Richland Circle Street Improvements
Infrastructure
Results
Van Meter, IA 50261

PCC Sidewalk/Trail
Infrastructure
Results
IA

PPCB Repair
Infrastructure
Results
IA

Grand Avenue - South Grand Prairie Parkway to South 115th Street
Infrastructure
Results
$9,065,000 est. value
West Des Moines, IA 50266

Walnut Street Streetscape Phase 1
Infrastructure, Alteration
Results
$56,060 est. value
Dallas Center, IA 50063

Last Updated 04/19/2022 03:04 PM
Project Title

Warrior Lane Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Waukee, IA 50263   (Dallas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Warrior Lane roadway improvements between Park Rd/Ford Ln and Waukee Middle School north entrance drive. Also included is construction of parking lot improvements at the west side of Waukee Middle School. The construction consists of approximately 10,100 square yards of PCC pavement, 690 linear feet of water main, 1,660 linear feet of storm sewer, earthwork, subgrade preparation, manholes, intakes, sidewalk and shared use path paving, surface restoration, landscape plantings, unit pavers, and other associated work. Work including landscaping at the Waukee Middle School parking lot and drives; grading, utility installation, sidewalks, trails, and street paving for the northern entrance to the Waukee Public Library; grading, utility installation, sidewalks, trails, and street paving for the roadway improvements to access both Waukee Middle School driveways and the northern entrance to the Waukee Public Library

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Planting Accessories, Landscape Edging.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents