Similar Projects
Records Building
Renovation - 7,000 SF
Conception
Spanish Fork, UT 84660

Courts - City Of Orem
Renovation
Conception
$298,000 CJ est. value
Orem, UT 84058

Downtown City Hall Redevelopment
Renovation
Bidding
$5,000,000 CJ est. value
Provo, UT 84601

DFCM Construction-AOC Provo Courts Two Courtroom Buildout-24049150-VBS AE Services
Renovation
Bidding
$3,200,000 CJ est. value
Provo, UT 84601

Logan District Courts Lighting Upgrade
Infrastructure
Sub-Bidding
$305,268 CJ est. value
Logan, UT 84321

Justice Court Renovation
Renovation
Post-Bid
West Valley City, UT 84119

RFP Construction Manager - Manti Sixth District Courthouse Administrative Office of the Courts
Demolition, New Construction, Infrastructure - 29,000 SF
Post-Bid
$13,107,870 CJ est. value
Manti, UT 84642

West Jordan City Hall Interior Remodel
Renovation
Results
$6,000,000 to $7,500,000 est. value
West Jordan, UT 84088

Construction Management / General Contractor Services Orem City Center
New Construction
Results
Orem, UT 84057

Utah State Capitol House Building Rules Renovations
Renovation
Construction
Salt Lake City, UT 84103

New City Hall - City of St. George
New Construction, Infrastructure
Conception
$29,296,600 CJ est. value
St George, UT 84770

General Contractor Services
New Construction
Post-Bid
Blanding, UT

DFCM Construction Pre-Qual Mechanical MTECH Provo Courthouse Repurposing Remodel Phase 1A
LEED Certification, Renovation
Results
$388,122 CJ est. value
Provo, UT 84601

Courts Building - City of American Fork
Renovation
Conception
$10,500,000 CJ est. value
American Fork, UT 84003

Morgan City Hall Basement
Renovation
Post-Bid
$462,300 est. value
Morgan, UT 84050

Last Updated 05/22/2023 12:42 PM
Project Title

Grand County Courthouse Boiler Room Update/Redesign

Physical Address View project details and contacts
City, State (County) Moab, UT 84532   (Grand County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals must included 1. Update/Repair the mixing wall to provide correct control of recirculated tempered or hot water throughout the detention center and courthouse- including all areas in the jail 2. Repair and or replace the main water line in the mixing wall area. 3. Replace the older of two hot water heaters; including seismic strapping 4. Miscellaneous items that come up in the pre bid meeting. 5. Provide a plan to maintain safe and sanitary working conditions for the courthouse and detention center during the work or installation. 6. Provide 2 year warranty on labor and 10 year on products 7. Obtain all building permits required to complete job 8. Provide an as built mechanical drawing Bidders must schedule a pre-bid meeting by contacting Shawn Fugit, at 435-259-1314, sfugit@grandcountyutah.net. Any request for clarification or additional information deemed necessary by any respondent to present a proper bid shall be made by contacting Shawn Fugit, Facilities Supervisor, (435) 259-1314 sfugit@grandcounyutah.net. To be considered, any such request must be received in time to allow the County sufficient time to prepare and disseminate a written response. When appropriate, valid requests received in accordance with the foregoing will be responded to in writing from the County in the form of an addendum addressed to all prospective respondents. All bids submitted shall be binding upon the respondent if accepted by Grand County within ninety (90) calendar days of the bid submission date. Negligence upon the part of the respondent in preparing the bid confers no right of withdrawal after the time fixed for the submission of bids. A performance bond in an amount equal to 100% of the contract price. A payment bond in an amount equal to 100% of the contract price to serve as protection of all persons or companies supplying labor and/or material to the contractor or its subcontractors for the performance of the contract. RFB DISCLAIMER. Grand County reserves the right to disqualify incomplete bids, waive minor defects as it deems applicable in the written bids, to request additional information from any respondent, change or modify the scope of the project at any time without penalty, negotiate terms with one or more of the respondents, reject any or all bids without penalty, and take any steps necessary to act in the Countys best interest. The County also reserves the unilateral right to order, in writing, changes in the work within the scope of the contract and changes in the time of performance of the contract that do not alter the scope of the contract work.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents