Similar Projects
Deer Creek Villas
New Construction
Design
Littleton, CO

Grounds Maintenance & Snow Removal Services for Peterson AFB and Cheyenne Mountain AFS, Colorado
Design

Median Trash and Vegetation Maintenance
Alteration
Bidding
CO

Painted Prairie Filing 1 - Green Space Landscaping
Post-Bid
Greenwood Village, CO 80111

Milliken Reservoir Slurry Wall D
Post-Bid
Greenwood Village, CO 80111

2020 Alley Grading and Stabilization
Results
Englewood, CO 80110

BAFB Enclave Erosion Control
Results
Less than $400,000 est. value
Greenwood Village, CO 80112

Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

2021 Tree Planting
Post-Bid
Greenwood Village, CO

Veterans Memorial Cemetery - Stream and Pond
Results
Less than $800,000 est. value
Greenwood Village, CO 80112

Metro Center - Parcel A
New Construction
Design
Aurora, CO 80012

Cherry Park Irrigation Renovation Project
Post-Bid
Centennial, CO 80111

On-Site Improvements
Results
Greenwood Village, CO 80111

Metro Center - Parcel B
New Construction
Design
Aurora, CO 80017

2021 Tree Pruning and Removal
Term Contract
Post-Bid
Greenwood Village, CO

Reported 02/25/2022 12:00 AM
Project Title

2022 Alley Grading and Stabilization - Zone 3

Physical Address View project details and contacts
City, State (County) Englewood, CO 34223   (Arapahoe County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The primary intent of this project is to improve the drainage and rideability of the City’s Zone 3, 4 and 5 alleys while decreasing their rate of deterioration through the application of a magnesium chloride based dust control and surface stabilization product. This contract includes provisions for grading, tree and bush trimming, structure adjustments, and application of a magnesium chloride based dust control and soil stabilization product.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents