Reported 05/07/2021 12:00 AM
Project Title

Network Cabling Installation and Maintenance

Physical Address View project details and contacts
City, State (County) Picatinny Arsenal, NJ   (Morris County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Management Requirements. A successful contractor shall complete program management and administrative tasks to ensure the requirements of the contract are met. The contractor must adequately control and supervise all personnel performing services under contract. Technical Requirements. Technical Requirements include (but are not limited to) the following: -Installation and testing outside plant fiber optics, aerial, buried and underground cables. -Rebuilding outside plant copper cables, and installing outside plant. -Terminating and installing single mode/multimode SC connectors on fiber optics. -Installing distribution pedestals and various OSP cabinets. -Installing conduit under streets/roads and along roadways for communication cable/fiber optic. -Removal and disposal of universal, as well as hazardous building materials that may be generated (or discovered if hazardous) as a result of maintenance activities. -Provide labeling of telecommunications systems IAW American National Standards Institute (ANSI), Electronic Industries Alliance (EIA), and Telecommunications Industry Association (TIA) National Electrical Code (TIA/EIA-606-A). -Label all outlets and patch panel positions indicating their function and unique identifier code. -Capture all devices, outlet locations, and designations on system drawings. The contractor shall be in compliance with federal, state, and local laws, rules, and regulations pertaining to environmental protection, occupational health and safety. The contractor shall provide all tooling and equipment needed for successful performance. The contractor shall also be responsible for the preparation and clean-up/clearance of all work sites from the commencement of work through acceptance of work. The contractor shall be required to maintain necessary insurance for personnel and equipment liability.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents