Last Updated 11/23/2020 02:13 PM
Project Title

Removal and Replacement of the Underground Fuel Tank and Dispenser

Physical Address View project details and contacts
City, State (County) Newark, MD 21841   (Worcester County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

• Remove the existing underground 6000-gallon gasoline tank per MDE regulations. • Remove the existing dispenser, fuel controller, fuel island, and suction line. • Take the required three soil samples after removal. • Backfill and compact the excavation with clean fill dirt. • Properly cut, clean, and dispose of the underground fuel tank. • Pour a new 6’x25’x12” concrete pad in the same location as the original fuel tank. • Supply and install a new 3,000-gallon Fireguard double walled gasoline tank on the new concrete pad, and surrounded by a new 8’ chain link fence with 4’ pass through gate. • Supply and install a new Fuelmaster FMU-2500 fuel controller with the Fuelmaster Plus software and 60 Prokees or equivalent. • Supply and install a new Bennett 3000 single hose fuel dispenser, with a 3/4hp submersible pump in the tank or equivalent. • A new 4’x10’ steel island will be set for the dispenser, controller, and light pole, and protected by 4” steel bollards with covers. • A new 1½” steel product line will be run aboveground from the tank to the dispenser. • A Cat5 communication cable will be ran from the Fuelmaster to the adjacent building to tie into the existing network. • New power wiring will be pulled through the existing conduits to the new dispenser, fuel controller, and submersible pump

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents