Similar Projects
Empire - AML Reclamation Project
Bidding
Irondale, AL

Recreation Center Drainage and Tennis Center Court Improvements
Bidding
Orange Beach, AL 36561

District 4 Water/Sewer Improvements (Fleming Road Drainage Improvements)
Post-Bid
$700,000 to $750,000 est. value
Montgomery, AL

Corrugated Steel Pipe
Term Contract
Post-Bid
Huntsville, AL

Gulley Repair on County Road 8 South of Tumbleton
Results
$85,000 to $115,000 est. value
AL

Storm Drainage Improvements
Results
Less than $200,000 est. value
Elberta, AL

Drainage Improvements on Fernwood Drive West
Bidding
Bay Minette, AL 36507

Lagoon Closure at Searcy Hospital
Post-Bid
Less than $425,000 est. value
Mount Vernon, AL

Erosion Control and Stabilization of Rock Creek
Results
Fairhope, AL

Chelsea Business Park-No 1 Grading and Storm Drainage
Bidding
Chelsea, AL

Gibbs Village East and West Erosion Control/Sidewalk Improvements
Post-Bid
Montgomery, AL

2724 16th Avenue North Drainage Improvements
Results
Birmingham, AL

Concrete Pipe, Inlet Boxes, Storm Pipe, IB Pipe, PVC Inlets and Ductile Iron Pipe
Bidding
Huntsville, AL

Mooreland Road Stabilization Project
Post-Bid
$100,000 to $120,000 est. value
Montgomery, AL

Tied Concrete Block Erosion Control Mat
Results
AL

Last Updated 02/06/2019 08:50 AM
Project Title

Stormwater Drainage Improvements

Physical Address View project details and contacts
City, State (County) Taylor, AL   (Houston County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $167,265
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Work of the Project consists of, in general, construction of approximately 295 LF of 24" storm drain pipe, 1 inlet, 7,680 SY paving overlay, 425 SY paving replacement, curbing and sodding and all appurtenances necessary to complete the stormwater drainage improvement project. The Owner requires the project to be completed within thirty (30) consecutive calendar days.
Details
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents