Similar Projects
Last Updated | 02/17/2022 03:23 PM |
Project Title | New Student Center Boiler Replacement |
Physical Address | View project details and contacts |
City, State (County) | Green Bay, WI 54303 (Brown County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC, Mechanical |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is located at Northeast Wisconsin Technical College in Green Bay, Wisconsin. The scope of work includes the removal of two (2) existing hot water boilers and the installation of two (2) new hot water boilers. Additional work will include hot water piping revisions, insulation, stack replacement, electrical, and controls. Work includes HVAC, controls, and electrical. Work on this project will consist of a single lump sum contract for all work. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |