Similar Projects
David Avenue Street Rehabilitation - CIP 23-04 - City of Pacific Grove
Infrastructure
Conception
$400,000 CJ est. value
Pacific Grove, CA 93940

Cedar Sunset And Congress Intersection Improvements - CIP 23-03 - City of Pacific Grove
Infrastructure
Conception
$5,000,000 CJ est. value
Pacific Grove, CA 93950

The Park Lane
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Monterey, CA 93940

America's Tire / Seaside
New Construction, Infrastructure - 11,191 SF
Design
$3,000,000 CJ est. value
Seaside, CA 93955

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

FY 21/22 Pavement Rehabilitation Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Seaside, CA 93955

Contract to Install - Poured in Place Surfacing
Renovation
Post-Bid
Salinas, CA 93901

Contract to Install - DSA Approved Shade Shelter
Renovation
Post-Bid
Salinas, CA 93901

Day Use Lot Two Overlay
Renovation
Results
$80,000 est. value
Big Sur, CA 93920

Historic Barn Repairs Andrew Molera State Park
Renovation
Results
$275,000 est. value
Big Sur, CA 93920

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

Rehab Bridge
Infrastructure
Design
$4,999,000 CJ est. value
Castroville, CA 95012

OMC-Repair Stormdrain Pipe at GJM/GIGLING
Infrastructure
Bidding
$400,000 CJ est. value
Monterey, CA 93940

Graphic Arts and Nursing Site Improvement Project
Infrastructure
Post-Bid
$500,000 est. value
Monterey, CA 93940

Construct the Track and Field Improvements at Salinas High School
Renovation
Results
$500,000 est. value
Salinas, CA 93901

Last Updated 08/24/2022 03:34 AM
Project Title

Poured in Place Surfacing - Playground Equipment

Physical Address View project details and contacts
City, State (County) Salinas, CA 93901   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Monterey County Office of Education (hereinafter referred to as MCOE) will receive sealed bids prior to the date and time stated for the Bid Opening for the award of the Contract to install: Poured in Place Surfacing; Playground equipment that is similar or equal to the following options for children ages 2-5 years: (1) Bod Stilts; (1) 6 Log steppers; (1) Junior Tower; (1) Log Pile 4.1; (1) Home Dome; (2) Cozy Cocoons; (2) Concerto Chimes; (1) Inclusive Spinner; (1) Elevated sand table and (1) Mound with tunnel at the following sites: 1. Hartnell College/ Alisal Campus Early Learning Program 1752 E. Alisal Street, Salinas, CA 93905 For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to submit a bid or to be listed in a bid proposal subject to the requirements of Public Contract Code section 4104 unless currently registered and qualified under Labor Code section 1725.5 to perform public work as defined by Division 2, Part 7, Chapter 1 (1720 et seq.) of the Labor Code. For all projects over Twenty-Five Thousand Dollars ($25,000), a contractor or subcontractor shall not be qualified to enter into, or engage in the performance of, any contract of public work (as defined by Division 2, Part 7, Chapter 1(1720 et seq.) of the Labor Code) unless currently registered and qualified under Labor Code section 1725.5 to perform public work. Contract Time for this project shall be 365 calendar days, and liquidated damages for delay shall accrue. See Agreement Between MCOE and Contractor for more information. All bids must be accompanied by a bid bond. Pursuant to the Contract Documents, the successful bidder will be required to furnish a Payment (Labor and Material) Bond in the amount of one hundred percent (100%) of the Contract Sum, and a Faithful Performance Bond in the amount of one hundred percent (100%) of the Contract Sum, as set forth in the Contract Documents. The successful bidder will be allowed to substitute securities or establish an escrow in lieu of retainage, pursuant to Public Contract Code Section 22300, and as described in the Agreement Between MCOE and Contractor and General Conditions. The MCOE will not consider or accept any bids from contractors who are not licensed to do business in the State of California, in accordance with the California Public Contract Code, providing for the licensing of contractors. In accordance with Section 3300 of said Code, the bidder shall have a Class "C61/D34" license and shall maintain that license in good standing through Contract completion and all applicable warranty periods. For all projects over Twenty-five Thousand Dollars ($25,000), bidder shall state the public works contractor registration number on the Designation of Subcontractors form for each subcontractor performing more than one-half of one percent (0.5%) of the bidder's total bid. The Director of Industrial Relations of the State of California, in the manner provided by law, has ascertained the general prevailing rate of per diem wages and rate for legal holidays and overtime work. The Contractor must pay for any labor therein described or classified in an amount not less than the rates specified. Copies of the required rates are on file at the MCOE's business office and are available on request.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents