Similar Projects
Tempe Campus Student Housing Renovations
Renovation
Conception
Tempe, AZ 85281

Tempe Campus Core Support Research Facility
New Construction
Conception
Tempe, AZ 85281

Design-Build Services
New Construction - 150,000 SF
Design
Tucson, AZ

Construction Manager at Risk Services Relating to the University of Arizona`s Andrew Weil Center for Integrative Medicine
New Construction - 34,000 SF
Design
Tucson, AZ 85721

Construction of the NATC Virtual Simulator Building/Tiny House Foundations
New Construction - 1,600 SF
Bidding
Taylor, AZ

Construction Services Job Order Contracting
New Construction
Bidding
Tucson, AZ

The Bridges, High Bay Facility
New Construction - 4,000 SF
Sub-Bidding
Tucson, AZ

Mcccd Phoenix College Building A Remodel
Post-Bid
Phoenix, AZ 85013

CMAR Services for Multiple Projects at Cavit
Term Contract
Post-Bid
Less than $4,000,000 est. value
Coolidge, AZ

Construction Manager at Risk (CMAR) Services - Life Science / Physical Science Remodel and Building Additions - South Mountain Community College
Renovation, Addition
Results
$11,500,000 est. value
Phoenix, AZ 85040

NAU Science Annex 1st. and 2nd. Floor Renovation
Results
$5,335,406 est. value
Flagstaff, AZ 86011

Applied Research Building
New Construction - 60,000 SF
Construction
Less than $33,000,000 est. value
Phoenix, AZ

Chemistry Building Renovations
Renovation - 75,000 SF
Construction
Tucson, AZ 85721

West Campus Student Housing Academic/Office Space
New Construction
Conception
Glendale, AZ 85306

Pre-Engineered Shade Structures
Post-Bid
AZ

Reported 12/22/2021 02:23 PM
Project Title

Capla Addition and Renovation

Physical Address View project details and contacts
City, State (County) Tucson, AZ 85721   (Pima County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status All Sub-Bids Received, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $1,400,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CAPLA has recently completed the pre-design Programming that is aligned with the College’s overall Strategic Plan, with the goal being to improve space utilization and provide academic facilities that will enhance learning and meet increased student enrollment. The project will be implemented in phases. The complete Conceptual Design for the entire Design Program is ongoing. Thereafter, the first phase of the project will be identified. The CM@Risk involvement will commence with Phase One Pre-Construction Services. It is anticipated that Phase One will have a construction cost in the region of $1,400,000. Future phases will be contingent on the availability of funds.

Details

1 College/University, Renovation, 2 College/University, Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents