Similar Projects
Rathbun Creek Trail Phase 3 - C.5 - City of Big Bear Lake
Infrastructure
Conception
$1,591,600 est. value
Big Bear Lake, CA 92314

Hospital Channel - Yucca Valley
Infrastructure
Conception
$5,901,359 CJ est. value
Yucca Valley, CA 92284

State Street Village / Redlands Mall Development
New Construction, Infrastructure - 84,106 SF
Design
$275,000,000 CJ est. value
Redlands, CA 92373

Amazon Warehouse Development / Central Avenue
New Construction, Infrastructure - 201,096 SF
Design
$22,000,000 CJ est. value
Upland, CA 91786

9/11 Memorial Park
New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Maroon Bell - Winchester Water Main Replacement
Infrastructure
Bidding
$2,360,000 CJ est. value
Chino Hills, CA 91709

Parker -bullhead City Hwy. (SR 95) (Needles Bridge #2435)
Infrastructure
Post-Bid
$800,000 CJ est. value
Bullhead City, AZ 86442

Asphalt Seal and Stripe - East Side
Infrastructure
Post-Bid
$300,000 CJ est. value
Victorville, CA 92395

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Stanfield Cutoff Restroom Site Preparations Project
Infrastructure
Results
$300,000 est. value
Big Bear Lake, CA

O'Reilly Auto Parts (CL3) #6229 / Colton
New Construction, Infrastructure - 7,319 SF
Construction
$2,000,000 CJ est. value
Colton, CA 92324

VVC Stadium and Educational Event Center
New Construction, Renovation, Infrastructure
Construction
$32,338,000 CJ est. value
Victorville, CA 92395

Pumalo Street Townhomes
New Construction, Infrastructure
Pending Verification
$4,500,000 CJ est. value
San Bernardino, CA 92404

Silver Peak Solar Project
New Construction, Infrastructure
Pending Verification
$150,000,000 CJ est. value
Adelanto, CA 92301

Dupont Avenue Pavement Rehabilitation - City of Ontario
Infrastructure
Conception
$195,000 CJ est. value
Ontario, CA 91761

Last Updated 07/24/2023 11:35 AM
Project Title

California Street Landfill Gas Extraction Wells Phase 2 & 3

Physical Address View project details and contacts
City, State (County) Redlands, CA 92373   (San Bernardino County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $423,726 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

California Street Landfill Gas Extraction Wells Phase 2 & 3. The work located entirely within the California Street Landfill, located at 2151 Nevada Street, Redlands, CA 92373 and consists of furnishing all labor, materials, equipment, and services, and performing all work related to the construction of the Landfill's gas (LFG) collection and control system. Drilling and installing new LFG vertical extraction wells, including casings, gravel, bentonite, soil backfill, and wellheads. Installing and aligning lateral LFG pipe, valves, fitting and other appurtenances, and connecting to existing LFG lateral and header piping of varying sizes. The work shall be in accordance with the applicable requirements of the state and local agencies, Construction Drawings, the Technical Specifications and these special provisions. It will be the Contractor's responsibility to be fully appraised of site conditions and to follow local ordinances. The Site Operator conducts landfilling operations in an area adjacent to the construction location. The Contractor will avoid interfering with ongoing landfill operations. Question Deadline 06/27/2023 at 2:15 PM PT Online Q&A Yes

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents