Similar Projects
Drilling Well 5
Term Contract, Infrastructure
Bidding
Florence, AZ

Northwest Recharge, Recovery, and Delivery System (NWRRDS) Recovery Well Drilling, Installation, and Testing
Post-Bid
Less than $877,205 est. value
Tucson, AZ 85704

Repair and Reassemble Well #12
Post-Bid
Luke Air Force Base, AZ 85309

Y--Nixon REC/Admin Site Well Drill Project
Results
$100,000 to $250,000 est. value
Colorado City, AZ

Valentine Well
Results
Phoenix, AZ 85027

Pricing Drilling and Construction of Multiple Irrigation Wells
Post-Bid
Maricopa, AZ 85138

Camp Well & Calhoun Well Drills
Results
$25,000 to $100,000 est. value
AZ

F--Bodaway-Gap Well Installation
Post-Bid
$100,000 to $300,000 est. value
Tuba City, AZ

Dry Well And Interceptor Pumping And Inspection
Results
Phoenix, AZ

N--AZ-San Bernardino NWR-Replacement Wells
Post-Bid
$120,000 to $175,000 est. value
Douglas, AZ

Trailer Mounted Water Pumps
Results
Phoenix, AZ 85003

Job Order Contract (JOC) for Water Production Wells and Facilities
Term Contract
Post-Bid
$250,000 est. value
Show Low, AZ

Well Abandonment on FAIR
Results
$100,000 to $250,000 est. value
Whiteriver, AZ 85941

Navajo Nation Western Navajo Pipeline Phase 1 - Bodaway-Gap Well Project
Post-Bid
Fort Defiance, AZ 86504

Site 20 - New Reservoir, Reservoir Rehabilitation and Direct Well
Results
Gilbert, AZ 85297

Reported 10/01/2021 12:00 AM
Project Title

Arizona Drilling and Installation of the Alamo Springs Well 2

Physical Address View project details and contacts
City, State (County) Fort Defiance, AZ   (Apache County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of: Installation of 16-inch diameter, 40-foot-long surface casing; Drilling 14 -inch pilot boring to a depth of 1,300 feet below ground surface (bgs); Conducting geophysical logging; Constructing 8 5/8-inch (OD) diameter well as specified; Performing pump tests; Procurement and setting the well pump; Installation of pitless adapter unit.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents