Similar Projects
Annual UPCS, UPCS-V and/or NSpire Inspection Services
Term Contract
Bidding
Malden, MA

Construction Supervision Services for Rehabilitation of the New Boston Main Interceptor
Bidding
South Boston, MA

Section 8 HQS Inspection Services
Term Contract
Post-Bid
Less than $100,000 est. value
Fall River, MA

Lead Inspections Phase II
Post-Bid
Lowell, MA 01854

C--Bridge Inspection and Assessment Worldwide
Results
$10,000 to $10,000,000 est. value

C--Bridge Inspection and Assessment Worldwide
Results
$10,000 to $10,000,000 est. value

Water Quality Monitoring
Bidding
Nantucket, MA

Ead Inspections / Risk Assessments for Lead Paint Abatement
Post-Bid
Lynn, MA 01902

H--Inspection and Testing of the Medical Gas and Vacuum Systems
Term Contract
Results
Bedford, MA 01730

Construction Inspection and Engineering Services for Various Streets
Post-Bid
Boston, MA

Prepare a Report Documenting Needed Upgrades and Repairs to Various Structures
Results
Edgartown, MA 02539

Solar Feasibility Study
Post-Bid
$12,400 est. value
Heath, MA 01346

Leak Detection Survey for Water Distribution System
Results
Andover, MA

On-Call Environmentals Services for Disaster Recovery and Compliance
Term Contract
Post-Bid
Springfield, MA 01103

Survey Services for As-Built's on As-Needed Basis
Term Contract
Results
$300,000 est. value
Boston, MA

Reported 01/13/2021 07:08 AM
Project Title

H--Annual Boiler Safety Device Testing

Physical Address View project details and contacts
City, State (County) Roxbury, MA 021324927   (Suffolk County)
Category(s) Professional Services
Sub-Category(s) Inspection Services
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Performance Requirements Perform all relevant boiler plant safety device testing in accordance with the latest Boiler plant safety device testing manual (currently 5th edition) safety device inspection to include: Review of safety device testing history Perform boiler plant safety device test using VA approved testing and documenting procedures. Specific observations include documenting: As found conditions Calibration corrections Any deficiencies Pass/fail (using the 3 question criteria) 1. Is the correct device installed? 2. Does the device activate at the proper set point that is in accordance with the criteria for the set point as defined herein and VA standards? 3. Does the device produce the proper result for its intended purpose? Prepare six completed testing booklets (5th edition); one for each of the five boilers and one for the Aux. equipment (DA, condensate tank & fuel oil pumps) Deliverables Inspection personnel will be versed in the VA directive 1810 and the latest VA boiler plant safety device testing manual. Essential testing equipment and consumables. Field consultation to review conditions and report follow-up recommendations. Final report, (1) original, and (1) electronic copy, provided at completion of on-site activity.

Details

Division 01 - General Requirements, Quality Control, Testing and Inspecting Services.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents