Similar Projects
Demolition and Asbestos Removal Services Related to the Hazard Mitigation Grant Program (HMGP) Acquisition and Demolition Project
Term Contract, Demolition, Infrastructure
Post-Bid
$30,000 CJ est. value
Goldsboro, NC 27530

Goldsboro Business Campus - Phase I
Infrastructure
Post-Bid
Goldsboro, NC

AWOS Site Preparation and Installation
Infrastructure
Results
Mount Olive, NC

Stoney Creek Greenway Improvements Project
Infrastructure
Results
$187,500 CJ est. value
Goldsboro, NC 27530

Fremont Elementary
New Construction, Infrastructure - 109,336 SF
Construction
$24,000,000 CJ est. value
Fremont, NC 27830

Take 5 Oil Change / Goldsboro
Demolition, New Construction, Infrastructure - 1,400 SF
Pending Verification
$400,000 CJ est. value
Goldsboro, NC 27534

Magnolia Grove
New Construction, Infrastructure
Pending Verification
$119,000,000 CJ est. value
Goldsboro, NC 27530

Center for Industrial Technology and Engineering
New Construction, Infrastructure - 40,000 SF
Post-Bid
$12,199,360 CJ est. value
Goldsboro, NC 27530

Berkeley Boulevard Apartments
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Goldsboro, NC 27534

RFQ Design - Architectural Engineering Services for a New Middle School Replacement Project
New Construction, Infrastructure
Post-Bid
$40,000,000 CJ est. value
Goldsboro, NC 27530

North Oak Forest Road Apartments
New Construction, Infrastructure
Pending Verification
$118,000,000 CJ est. value
Goldsboro, NC 27534

Mavis Tire & Brakes / Goldsboro
New Construction, Infrastructure - 6,730 SF
Post-Bid
$2,000,000 CJ est. value
Goldsboro, NC 27530

Shelton
New Construction, Infrastructure
Pending Verification
$38,000,000 CJ est. value
Goldsboro, NC 27530

Parking Lot Resurfacing - Rebid
Infrastructure
Post-Bid
$300,000 CJ est. value
Goldsboro, NC 27530

SunTree Snack Foods Manufacturing Plant
Demolition, New Construction, Infrastructure
Pending Verification
$10,100,000 CJ est. value
Goldsboro, NC 27530

Last Updated 03/03/2023 01:34 PM
Project Title

Seymour Village

Physical Address View project details and contacts
City, State (County) Goldsboro, NC 27530   (Wayne County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Multi-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 107 townhomes. As of March 2023, this project is in the early planning stages, and received rezoning approval from the Goldsboro City Council. Information regarding the selection of an architect and general contractor has not been provided. A firm timeline has not been announced.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents