Similar Projects
Paving of Rosland Rd: Us 97 to Drafter Rd
Infrastructure
Bidding
$650,000 CJ est. value
La Pine, OR 97739

Taxiway Rehabilitation & Electrical Improvements
Infrastructure
Bidding
$640,000 CJ est. value
Brothers, OR 97712

South West 209th Avenue Kinnaman Road to Alexander Street Precast Concrete Pipe and Structures
Alteration
Post-Bid
Hillsboro, OR 97129

Columbia Children's Arboretum Improvement Project
Alteration
Post-Bid
Portland, OR

Day Care Building - ADA Improvements
Renovation, Alteration
Results
$150,000 est. value
Lakeview, OR 97630

Concrete Installation Services
Alteration
Results
$150,000 est. value
Hillsboro, OR

Covered areas, Concrete Slabs, and Sidewalks
Infrastructure, Alteration
Post-Bid
$2,000,000 est. value
Brookings, OR 97415

Museum of the Oregon Territory Parking Lot Repair
Infrastructure
Results
$115,000 est. value
Oregon City, OR 97045

Concrete Installation, Repair and Maintenance Services
Alteration
Post-Bid
Salem, OR

Precast Concrete Storm Pipe and Structures for SW 209Th Ave
Alteration
Results
Hillsboro, OR

MPCO(Multi-layer Polymer Concrete Overlay) Epoxy for Salem Bridge Crew
Alteration
Post-Bid
Salem, OR

Bateman Creek Fish Passage and Habitat Enhancement
Infrastructure, Alteration
Results
$408,000 est. value
Gales Creek, OR 97117

On-Call Repair and Maintenance Services Retainer Contract
Alteration
Post-Bid
Eugene, OR

Diamond Lake Rescue Building
New Construction, Alteration
Results
Roseburg, OR

Office Remodel - Oregon Department of Transportation District 11 Office
Build-out
Post-Bid
$350,000 CJ est. value
Klamath Falls, OR 97603

Last Updated 04/13/2023 04:09 PM
Project Title

Supply, Delivery, and Application of Liquid Asphalt Emulsion

Physical Address View project details and contacts
City, State (County) Lexington, OR 97839   (Morrow County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: A. Supplier shall furnish to Morrow County Public Works liquid asphalt emulsion as indicated below: CRS-3P Approximately 2000 tons Fog Seal Approximately 700 tons B. Supplier shall provide on a contract rental basis one asphalt distributor daily (unless otherwise directed) with qualified operators for applying the liquid asphalt emulsion to the road surface. C. The product shall be delivered to various job sites at dates and times directed by Morrow County. D. County will prepare road surfaces to receive the surface treatments at the specified job sites. E. County will provide traffic control measures. F. County will provide equipment and qualified operators for chip spreading, aggregate hauling, rolling, and sweeping. G. County will provide aggregate for surface treatment. H. This season’s project includes approximately 75 miles of chip seal. 25 miles this spring. And 50 A quote bond is not required for submission of a proposal. A performance bond is not required for this contract for the supply of materials. A payment bond is not required for this contract for the supply of materials. A. Supplier shall meet with County staff and review the proposed work and schedule at least one week prior to the start date. B. Morrow County reserves the right to void the contract at any time due to unforeseen occurrences (weather, mechanical breakdowns, union strike, lack of funds, inferior workmanship, etc. Questions regarding this Request for Proposal shall be addressed by email no later than seven days prior to bid closing to the following: Public Works Director Eric Imes miles in late summer. This includes chip sealing a 22 mile portion of the 53 road in southern Morrow County for the Forest Service and a couple miles for the City of Heppner. The intended period of operations is proposed as Monday May 1, 2023 through approximately Monday June 1, 2023. And August 14, 2023 through approximately September 28, 2023. The typical work week will be Monday through Thursday, ten (10) - hour work days, as scheduled by Morrow County.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents