Last Updated | 04/13/2023 04:09 PM |
Project Title | Supply, Delivery, and Application of Liquid Asphalt Emulsion |
Physical Address | View project details and contacts |
City, State (County) | Lexington, OR 97839 (Morrow County) |
Category(s) | Single Trades |
Sub-Category(s) | Concrete |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Scope of Work: A. Supplier shall furnish to Morrow County Public Works liquid asphalt emulsion as indicated below: CRS-3P Approximately 2000 tons Fog Seal Approximately 700 tons B. Supplier shall provide on a contract rental basis one asphalt distributor daily (unless otherwise directed) with qualified operators for applying the liquid asphalt emulsion to the road surface. C. The product shall be delivered to various job sites at dates and times directed by Morrow County. D. County will prepare road surfaces to receive the surface treatments at the specified job sites. E. County will provide traffic control measures. F. County will provide equipment and qualified operators for chip spreading, aggregate hauling, rolling, and sweeping. G. County will provide aggregate for surface treatment. H. This season’s project includes approximately 75 miles of chip seal. 25 miles this spring. And 50 A quote bond is not required for submission of a proposal. A performance bond is not required for this contract for the supply of materials. A payment bond is not required for this contract for the supply of materials. A. Supplier shall meet with County staff and review the proposed work and schedule at least one week prior to the start date. B. Morrow County reserves the right to void the contract at any time due to unforeseen occurrences (weather, mechanical breakdowns, union strike, lack of funds, inferior workmanship, etc. Questions regarding this Request for Proposal shall be addressed by email no later than seven days prior to bid closing to the following: Public Works Director Eric Imes miles in late summer. This includes chip sealing a 22 mile portion of the 53 road in southern Morrow County for the Forest Service and a couple miles for the City of Heppner. The intended period of operations is proposed as Monday May 1, 2023 through approximately Monday June 1, 2023. And August 14, 2023 through approximately September 28, 2023. The typical work week will be Monday through Thursday, ten (10) - hour work days, as scheduled by Morrow County. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |