Similar Projects
Vestas Wind Turbine Generator (WTG) Maintenance
Term Contract
Sub-Bidding
Fe Warren Afb, WY 82005

90 CS Premise Wiring Upgrade Building 333
Term Contract
Sub-Bidding
Fe Warren Afb, WY 82005

LED Pedestrian Countdown Signals
Term Contract
Post-Bid
Cheyenne, WY 82001

Add Lightning Protection to campus
Renovation
Post-Bid
$1,000,000 CJ est. value
Cheyenne, WY 82001

Cheyenne Streets (Yellowstone and Four Mile)
Alteration
Results
Cheyenne, Ranchettes, WY 82009

Generator Replacement
Alteration
Results
$230,000 est. value
Cheyenne, WY 82007

90 CS Premise Wiring Upgrade
Renovation
Post-Bid
$100,000 CJ est. value
Fe Warren Afb, WY 82005

LED Lighting Upgrade
Alteration
Results
$35,000 est. value
WY

As-Needs Electrician Services
Term Contract
Post-Bid
Cheyenne, WY 82001

City Network Operations Core Layer 3 Switch Replacement
Renovation
Results
$70,777 CJ est. value
Cheyenne, WY 82001

Community Living Center Bed Lights
Renovation
Post-Bid
$100,000 CJ est. value
Cheyenne, WY 82001

Electrical Contractor Services
Term Contract
Post-Bid
Cheyenne, WY 82001

Various LED Traffic Signal lamps
Term Contract
Post-Bid
Cheyenne, WY 82001

Solar-Powered 24 hour flashing beacon
Term Contract
Post-Bid
Cheyenne, WY 82001

Traffic Signal Heads and Housings
Term Contract
Post-Bid
Cheyenne, WY 82001

Last Updated 05/16/2023 09:12 AM
Project Title

Lighting Replacements at Transportation Complex

Physical Address View project details and contacts
City, State (County) Cheyenne, WY 82007   (Laramie County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $390,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes, but is not limited to, removal and replacement of interior and limited exterior light fixtures and associated system components. Replacement fixtures will be LED. Due to new safety protocols, visitors must enter the Administration Building through Door 1 located on the east side of the building. Each person MUST present a valid district-issued ID or driver's license to obtain a visitor's pass. This process may take 3 to 5 minutes per person. Bids will be collected, time and date stamped upon entry. Bidders will be assembled as a group until the official bid time is called; then collectively convene in the appointed place for the public opening. To ensure timely delivery and receipt of bids please plan accordingly. Questions regarding clarification or interpretation of the bid documents shall be addressed in writing to: ST+B Engineering, LLC 5920 Yellowstone Road, Ste 3 Cheyenne, WY 82009 (307) 259-7303 cisaacson@stb.engineering

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents