Similar Projects
RFP Construction Management / General Contracting (CM/GC) - HLET - Maintenance - 2023
Renovation
Post-Bid
$500,000 CJ est. value
Boulder, CO 80305

RFP Construction Manager - Residence One
New Construction, Infrastructure - 190,000 SF
Post-Bid
$91,700,000 CJ est. value
Boulder, CO 80302

Charis Bible College South Campus Student Housing
New Construction - 46,980 SF
Design
$13,000,000 CJ est. value
Woodland Park, CO 80863

Sijan Hall Dormitory
Renovation - 700,000 SF
Pending Verification
CO 80840

RFQ Construction Manager - Construction Manager / General Contractor Services for their Meadowood Housing Project
New Construction, Infrastructure
Post-Bid
Glenwood Springs, CO 81601

RFQ D/B - Consolidate Cadet Preparatory School Dormitory
New Construction
Design
$100,000,000 est. value
USAF Academy, CO 80840

UVWS - Laundry Room Upgrades
Build-out
Post-Bid
$3,000,000 CJ est. value
Pueblo, CO 81001

UVWS-Laundry Room Upgrades
Demolition, Renovation, Infrastructure
Post-Bid
$30,000 CJ est. value
Pueblo Dep Ac, CO 81001

Last Updated 10/13/2022 11:32 AM
Project Title

RFQ Design - Bear Creek Apartment B Building Maintenance 2023

Physical Address View project details and contacts
City, State (County) Boulder, CO 80303   (Boulder County)
Category(s) Residential
Sub-Category(s) Dormitory
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected May 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 13, 2022, this project is in the conceptual phase. An architect has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to May 2023. *The closed solicitation has been included below for reference: The project in Bear Creek Apartment B Building will include upgrades to mechanical system, plumbing, painting, and carpet during the summer of 2023. The Architect/Engineer team will provide design services. Design services include; Design Development, Construction Documents, Bidding, Contract Administration, and Post Construction Services, including Reimbursables and Opinion of Probable Cost as required by the Architect/Engineer Agreement Design/Bid/Build (Form SC-5.1), the Architect/Engineer Agreement Terms and Conditions Design/Bid/Build (Form SC-5.1TC), and the University of Colorado Supplemental Terms and Conditions to SC-5.1 and SC-5.1TC. Address all email requests to Patricia.McNallyLeef@Colorado.edu and Cynthia.London@colorado.edu Respondents must acknowledge all issued addenda in their submittal. Respondent initiated email requests for clarification will be received any time on or before Friday April 28, 2022 - 11:00 AM MDT/MST. All State responses will be issued by email addenda on or before May 03, 2022 - 11:00 AM MDT/MST. It is anticipated that oral interviews will be conducted on June 01, 2022. Interviews will be conducted at: 3500 Marine Street, Boulder, CO 80309. The time for interviews is to be determined. Key personnel from the firm and major consultants who will be directly involved with the project should attend the interview. The interview panel will, in particular, be interested in knowing about the project approach proposed and in meeting the individuals who will act as the primary contacts with The University of Colorado Boulder Housing Facilities Services Group. Submittal Screening May 17 -May 24, 2022 A/E Interview List Released May 25, 2022- due 11:00 AM MDT/MST A/E Oral Interviews (as scheduled) June 01, 2022 Negotiation of A/E Contract June 06-June 30, 2022, 2022 Contract Approval (projected) July 15, 2022 Anticipated Design Start July 18, 2022 Anticipated Construction Start/Finish May 15, 2023-July 31, 2023 The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents