Similar Projects
HVAC Services- DMV Norfolk-Widgeon Road CSC
Post-Bid
Chesapeake, Norfolk, VA 23513

HVAC and Mechanical Products
Term Contract
Post-Bid

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

HVAC System Replacement at the Landstown Transfer Station
Results
Chesapeake, VA 23320

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

HVAC Preventative Maintenance and Emergency Service
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA

HVAC Maintenance and Repair
Post-Bid
Chesapeake, Portsmouth, VA 23322

Commercial HVAC Equipment and Technical Services
Results
$156,270 est. value
Chesapeake, VA

Armstrong SF665DW Heater Replacement Parts
Post-Bid

Packaged Rooftop Unit Replacement - Portlock Primary School
Results
Chesapeake, VA

Packaged Rooftop Unit Replacement - Hickory Middle School and Hugo A. Owens Middle School
Results
Chesapeake, VA 23322

Maintenance and Repair Services on HVAC Direct Digital Control Systems
Term Contract
Results
Chesapeake, Norfolk, Portsmouth, Suffolk, Virginia Beach, VA 23320

Packaged Rooftop Unit Replacement - Edwards-Wilson Center
Term Contract
Results
Chesapeake, VA 23324

Cooling Tower Replacement - Indian River Middle School
Results
$118,370 est. value
Chesapeake, VA 23322

HVAC Replacement - Portlock Primary School Media Center
Results
Chesapeake, VA

Last Updated 11/18/2020 05:01 PM
Project Title

Chiller Replacement - Sparrow Road Intermediate School

Physical Address View project details and contacts
City, State (County) Chesapeake, VA 23325   (Chesapeake City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $249,875
Plans Available from Municipal Agency - 10/12/20
Owner View project details and contacts
Architect View project details and contacts
Description

The work primarily consists of, but is not limited to: 1. Removal of existing air-cooled chiller. 2. Disconnecting chiller water electrical and control connections from existing chiller. 3. Installation of new TRANE air cooled Chiller. 4. Connection of existing piping to new chiller. 5. Electrical connection and minor rework of existing power to provide for operation of new chiller. 6. DDC temperature controls connected to the existing building temperature control system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents