Similar Projects
Water Treatment Facility at the Larry Street Tank Site
New Construction
Bidding
Daphne, AL 36526

Northport WTP - Filter and SCADA Improvements - Phase I
Renovation, Alteration
Bidding
Northport, AL 35475

Water Source Improvements and SCADA
Post-Bid
Less than $500,000 est. value
West Blocton, AL 35184

Contract 1 - South Settling Basin Cold Joint Repair at The R.J. Chandler Water Treatment Plant
Post-Bid
Selma, AL 36701

Wright Smith Jr. WWTP Headworks Replacement Project
Results
Mobile, AL

Replace Six (6) Effluent Valves and Six (6) Actuators at HE Myers WTP
Results
Mobile, AL 36608

Decatur Utilities WTP Finish Water Pumping Improvements
Post-Bid
Less than $7,000,000 est. value
Decatur, AL 35609

City of Dothan New Cypress Creek WWTP Ultraviolent (UV) Disinfection Equipment Installation
Results
Less than $252,600 est. value
Dothan, AL 36301

Hall Road WWTP Phase 2
Post-Bid
Grand Bay, AL

2019 Water System Improvements - Contract D New Water Treatment Plant
Results
Buhl, AL 35446

Bullard Water Main Replacement
Renovation
Post-Bid
Vinemont, AL 35179

Upgrades To Fort Payne Wastewater Treatment Plant Contract 2
Results
Less than $606,000 est. value
Fort Payne, AL

Shine Road Well Iron Treatment Facility
Post-Bid
Bayou La Batre, AL

SRF Tertiary Filtration and Ultraviolet Disinfection
Results
Daphne, AL 36526

South Parkway Water Treatment Plant Improvements
New Construction
Post-Bid
Huntsville, AL 35803

Reported 02/08/2022 12:00 AM
Project Title

Stickney WTP Building Replacements and Electrical Upgrade

Physical Address View project details and contacts
City, State (County) Mobile, AL 36618   (Mobile County)
Category(s) Sewer and Water
Sub-Category(s) Water Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Water Treatment Plant, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents