Similar Projects
Happy Hollow Park and Zoo Lower Zoo Electrical Improvements - City of San Jose
Alteration
Conception
San Jose, CA

EHRM Infrastructure Upgrades Design-Build
Infrastructure
Design
$10,000,000 to $20,000,000 est. value
McClellan, CA 95652

Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

Waste Sidestream Pump Station VFD Replacements at Plant No. 1
Renovation
Sub-Bidding
$1,455,000 CJ est. value
Fountain Valley, CA 92708

RFQ Contractor - San Luis Rey Elementary School Campus Modernization - Electrical
Renovation
Sub-Bidding
$4,500,000 CJ est. value
Oceanside, CA 92054

Emergency Backup Generator
Alteration
Post-Bid
CA

Uninterruptable Power Supply (UPS) Systems
Alteration
Post-Bid
Fresno, CA

2210 Napa-Vallejo Highway Temporary Construction Power
Alteration
Results
$75,000 est. value
Napa, CA 94559

LAUS Wires And Cables
Alteration
Results
Less than $1,300,000 est. value
Los Angeles, CA 90081

Shaffer Mountain Project - Conduit Installation
Infrastructure
Sub-Bidding
$400,000 CJ est. value
Susanville, CA 96130

Electrical Conditions Assessment and Developing Preventative Maintenance Plan Prospective Consultants
Alteration
Post-Bid
Jurupa Valley, CA 91752

Design-Build Services for the CHC Solar Project
Alteration
Results
San Bernardino, CA 92405

Forestville Generator Installation
Renovation
Sub-Bidding
$123,200 CJ est. value
Forestville, CA 95436

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

FMS Paving and Lighting
Infrastructure, Alteration
Results
$1,500,000 est. value
Los Alamitos, CA 90720

Last Updated 09/20/2022 05:04 AM
Project Title

Electric Power Resiliency - Buildings 57 and 58

Physical Address View project details and contacts
City, State (County) Tracy, CA 95304   (San Joaquin County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $4,750,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Sep 01, 2022 Contract Award Number: SP330022C0004 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: MEKSHDL5THP8 Contractor Awarded Name: SOUZA CONSTRUCTION, INC. Contractor Awarded Address: Farmersville, CA 93223-2040 USA Base and All Options Value (Total Contract Value): $4750000.00 A0006 ******Amendment SP330022B00010006 is attached..Amendment 0006 is being issued to correct an error in the provided magnitude of this construction effort and extend the bid due date in response to this error to allow bidders the opportunity to review their bids. Current provided magnitude of this construction effort is revised from Between $1,000,000 and $5,000,000 to Between $5,000,000 and $10,000,000. Currently submitted Bids must be confirmed. All currently submitted Bids can be used unless overwise updated. A0005 *****Amendment SP330022B00010005 is attached. Amendment 0005 is issued to answer late Vendor questions, remove FAR clause 52.225-11 Buy American - Construction Materials Under Trade Agreements (NOV 2021) from the solicitation and add the full text of FAR clause 52.225-9 Buy American - Construction Materials (NOV 2021). No further Questions will be entertained. A0004 ****Amendment SP330022B00010004 is attached. Amendment 0003 is issued to extend the Bid date and to answer another Vendor question. A0003 ***Amendment SP330022B00010003 is attached. Amendment 0003 is issued to extend the Bid date. A0002 **Amendment SP330022B00010002 is attached with a Revised Attachment 3. Amendment 0002 is issued to provide a revised Attachment 3 and to answer more Vendor questions. A0001 *Amendment SP330022B00010001 is attached with a Revised Attachment 4. Amendment 0001 is issued to extend the Bid date, to provide a revised Attachment 4, and to answer Vendor questions. Please take note of the postponed Bid Date. See Full Solicitation # SP330022B0001 attached, for SIte Visit Date and Time, Questions Submittal Date, and extensive Electronic Bidding Process, as well as Due Date and Time. PROJECT DESCRIPTION: This project will provide construction services to include all labor, management, supervision, tools, materials, equipment, and transportation to Design and Construct an Electric Power Resiliency Bldgs. 57 and 58 project. This project will consist of providing all labor, supervision, materials, tools, and equipment to "Design and Construct roof mounted 500 KW solar photovoltaic system for building 57 and Design and Construct roof mounted 300 KW solar photovoltaic system for building 58". The project includes the following work: Project Description: Contractor is to provide all labor, supervision, materials, tools, and equipment design and install roof mounted 500 KW solar photovoltaic system for building 57 and 300 KW solar photovoltaic system for building 58. 2. PV electrical output will be interconnected with the existing electric service to each building. 3. All PV generated will be used to displace "behind-the-meter" retail electric consumption. 4. The PV solar panels' layout of the rooftop PV system shall be designed so as not to interfere with the servicing of existing mechanical equipment, roof drains, or other roof equipment that requires regular servicing. Access aisles will be provided on the rooftop and appropriate clearances to maintain roof top mechanical equipment. 5. PV system shall meet 85 mph 3 second gush wind load. 6. Use maximum ballasts for PV panel anchoring. Repair, seal, weather tight all roof penetration. Coordinate with the roof manufacturer to provide certificate of roof warranty not invalidated by solar PV installation. 7. Output from the PV panels will be converted to AC through inverter mounted on solar panels and then interconnected to the main electrical switchgear. The new PV systems will tie in with the existing Base-wide electrical distribution system. 8. PV system design include appropriate disconnects and grounding systems to safely interface with the government's distribution. All work shall be performed complete and in accordance with the Specifications including Scope of Work and Drawings. SCOPE OF WORK: Attachment 2 SPECIFICATIONS: Attachment 3 DRAWING NO(S): Attachment 4 APPLICABLE SUBMITTAL REGISTERS: Attachment 5 PRE-CONSTRUCTION MEETING AND INITIAL and FINAL SUBMITTALS: SECTION F *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents