Similar Projects
Last Updated | 02/17/2021 11:22 AM |
Project Title | Pump Road Sidewalk Improvements |
Physical Address | View project details and contacts |
City, State (County) | VA (Henrico County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Engineer |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The Work consists of constructing pedestrian access along the east side of Pump Road from Sandy Bluff Drive to Hazel Tree Drive. The following improvements will be constructed, including: 0.44 miles of 5’ sidewalk, 2’ wide utility strip, road widening, curb and gutter and storm sewer on the east side of Pump Road between the existing taper just north of Sandy Bluff Drive and Hazel Tree Drive. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |