Similar Projects
Parking Lot and Bus Routing Improvements to George Washington Carver Elementary School
Infrastructure
Bidding
Tuskegee, AL 36083

Multi-Use Recreational Trail Expansion along SR-1 (US-431)
Post-Bid
$1,000,000 to $2,000,000 est. value
Guntersville, AL 35976

Whistler Street Sidewalk Improvements
Post-Bid
$158,650 to $193,895 est. value
Prichard, AL 36610

Phenix City Riverwalk
Results
Phenix City, AL

Streetscape and ADA Improvements Along SR 21
Results
$1,808,759 est. value
Sylacauga, AL 35150

Moniac Sidewalk and Tullis Manor Driveways
Alteration
Construction
Atmore, AL 36502

Delta Port Parking Lot and Shoreline Improvements
Post-Bid
Dauphin Island, AL

Mountain View Drive Sidewalk Improvements
Results
Less than $370,000 est. value
Hoover, AL 35216

Stower's Hill Walking Track
Post-Bid
Attalla, AL

Downtown Streetscapes Phase IV and Phase V
Results
Less than $430,000 est. value
Lanett, AL 36863

9th Street Median and 36th Avenue Sidewalk Improvements Project
Post-Bid
Tuscaloosa, AL 35401

Swan Creek Greenway Trailhead
Results
Less than $160,000 est. value
Athens, AL 35611

Construction of an Access Road to Arab Primary School
Post-Bid
$1,000,000 to $1,200,000 est. value
Arab, AL 35016

City Hall Parking Lot Addition
Results
$150,000 to $225,000 est. value
Daphne, AL

Dauphin Island Repairs to West End Beach
Post-Bid
Dauphin Island, AL 36528

Reported 03/16/2022 12:00 AM
Project Title

Bayfront Street Scape and Parking Improvements

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Phase 1 of this project consists of approximately 2,035 linear feet of roadway construction on Bayfront Park Drive. The proposed work will require the demolition of the existing roadway, as well as the addition of curbing, sidewalk, a traffic calming device, stormwater inlets/piping, water/sewer relocates, and landscaping. The project includes the addition of on street parking and an additive alternate for pervious pavement has been included (parking & traffic calming device only). Shared driveway concrete turnouts are proposed for lots without existing access. Phase 2 of this project is an alternate and consists of approximately 315 linear feet of new roadway that provides a “cut-through” on the west side of Moe’s BBQ that will connect Bayfront Park Drive to the rear parking area behind the Mobile Infirmary medical building. On street parking is also proposed for this phase and it includes an additive alternate for pervious pavement (parking only).

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents