Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pavement Rehabilitation
Infrastructure
Design
$32,220,000 CJ est. value
Susanville, CA 96130

Partial Depth Recycle, HMA and Recessed Thermoplastic Stripe
Infrastructure
Bidding
$3,010,000 CJ est. value
Susanville, CA 96130

Partial Depth Recycle, HMA and Recessed Thermoplastic Stripe
Infrastructure
Bidding
$3,010,000 CJ est. value
Susanville, CA 96130

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Pavement Replacement
Infrastructure
Post-Bid
$280,000 est. value

Expand Existing Brake Check Area and HMA paving
Infrastructure
Results
$1,140,000 est. value
CA

Cold Plane Asphalt Concrete Pavement and Place HMA
Infrastructure
Results
$1,380,000 est. value
CA

Poison Lake Curve Improvement Project - Lassen County
Alteration
Pending Verification
$1,000,000 est. value
Susanville, CA

Intersection Improvement
Infrastructure
Design
$4,980,000 CJ est. value
Susanville, CA 96130

Litchfield Maintenance Shop Project
New Construction, Infrastructure - 3,000 SF
Post-Bid
$1,000,000 CJ est. value
Wendel, CA 96136

Replace AC Surfacing, Asphalt Rubber Binder, Seal Coat and HMA Overlay
Infrastructure
Results
$2,200,000 est. value
CA

Curve Improvement
Infrastructure
Design
$2,950,000 CJ est. value
Susanville, CA 96130

Hog Fire Stewardship - Eagle Lake Field Office
Infrastructure
Post-Bid
Susanville, CA 96130

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Last Updated 02/10/2023 04:37 AM
Project Title

CAPM

Physical Address View project details and contacts
City, State (County) Susanville, CA 96130   (Lassen County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected November 2024
Bids Due View project details and contacts
Estimated Value $13,040,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

CAPM Project ID : 0218000074 Bkpm: 0.74 Ahpm : 11 Proposed Advertise Date : 05/09/2024 As of February 10, 2023, the project is in Design status. Anticipated construction year is 2024. CADOT - CAPM *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents