Similar Projects
Police Academy Improvements - BL095 - City of Des Moines
Addition, Demolition, Build-out, Renovation, Infrastructure
Conception
$850,000 CJ est. value
Des Moines, IA 50315

Roadway Reconstruction - Fleur Drive - ST267 C038EG - City of Des Moines
Infrastructure
Conception
$15,231,289 CJ est. value
Des Moines, IA 50321

South Service Area Segment 4 and 10 Sewers
Infrastructure
Design
$5,518,000 CJ est. value
West Des Moines, IA 50265

South Service Area Segment 4 and 10 Sewers
Infrastructure
Design
$5,518,000 CJ est. value
West Des Moines, IA 50265

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1 Rebid
Infrastructure
Bidding
$15,010,000 CJ est. value
Des Moines, IA 50309

Wastewater Reclamation Authority (WRA) Ingersoll Run Outlet Sewer, Phase 28, Segment 1 Rebid
Infrastructure
Bidding
$15,010,000 CJ est. value
Des Moines, IA 50309

Readiness Center and SE Fire Station and Training Facility
LEED Certification, New Construction, Infrastructure - 114,004 SF
Post-Bid
$5,250,000 CJ est. value
West Des Moines, IA 50265

Commerce Crossings Development Public Improvements
Infrastructure
Post-Bid
Bondurant, IA

8th Street SE Water and Sewer Extensions
Results
$1,463,902 est. value
Altoona, IA

2021 PCC Street Patching Program
Infrastructure
Results
$446,625 est. value
Ankeny, IA

Central Campus Multipurpose
Renovation, Infrastructure
Design
$921,000 CJ est. value
Des Moines, IA 50309

Truck Entrance Road Rehab and Replacement
Infrastructure
Post-Bid
Johnston, IA

2021 HMA Residential Paving Program Contract 2
Infrastructure
Results
$800,000 est. value
Des Moines, IA

Prospect Support Facility Parking Lot Replacement Project
Infrastructure
Design
$1,169,000 CJ est. value
Des Moines, IA 50310

Camp Dodge Truck Entrance Road Rehab and Replacement
Renovation, Infrastructure
Post-Bid
Johnston, IA 50131

Last Updated 09/08/2022 03:49 PM
Project Title

8th Street Joint Utility Trench - I-235 to Clegg Road

Physical Address View project details and contacts
City, State (County) West Des Moines, IA 50265   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $750,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as the installation of a joint utility trench as a multi-user conduit system along the east side of 8th Street in the ROW commencing at the north ROW of Clegg Road and running to the south ROW of Center Street, including crossings under 8th Street. All conduit to be furnished and installed by the Contractor. Contractor shall install City and vendor provided hand holes. Also included is installation of tracer wire, pull rope, conduit sweeps to hand holes, surface restoration, and other miscellaneous work needed to complete the project.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents