Similar Projects
Last Updated | 12/01/2022 01:37 PM |
Project Title | Installation Of New Playground Surface & Drainage System At Stillmeadow |
Physical Address | View project details and contacts |
City, State (County) | Stamford, CT 06902 (Fairfield County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Park/Playground, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected August 2022 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $2,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As of 7/6/2022 all bids rejected and the Owner will rebid this project at a later date. Installation of New Playground Surface and Drainage System at Stillmeadow Elementary School The scope of work includes removal of existing playground surface, installation of new drainage system to be connected to the existing storm sewer system, and to install new pour-in-place surface Bid Deposit 5% Performance & Payment Bond 100% Contact for Technical Questions: Lyudmila Fuks, Clerk of the Works II, (203) 977-4135 or lfuks@stamfordct.gov For questions regarding the purchasing or bidding procedures, call or email Erik J. Larson, Purchasing Agent at (203) 977-4107 or elarson@stamfordct.gov. The City reserves the right, for any reason, to refuse any and all bids submitted under these bid specifications. The City also reserves the right to select the option that it believes is the most beneficial to the City of Stamford. LOCATION AND DESCRIPTION OF WORK The Stillmeadow Elementary School Playground is located at 800 Stillwater Road has a pour-inplace surface that is at the end of its useful life's span. Also, the playground has a brook running through and adjacent to it. Therefore, there is a need for drainage upgrade before the installation of the new playground surface. The playground equipment has been inspected and is in a good condition and for that reason will remain as installed. SCOPE OF WORK The scope of work shall include but is not limited to the following: removal of existing playground surface; installation of a new drainage system that will be connected into the existing storm sewer system; installation of a new pour-in-place surface; repair of safety zones around some existing playground equipment and planting of new shrubs and as specified in the construction drawings and specifications attached in this section. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |