Similar Projects
Baron's South - Park Improvements - Town of Westport
New Construction
Conception
Less than $500,000 est. value
Westport, CT 06880

Compo South Beach Skate Park Replacement - Town of Westport
Renovation
Conception
$250,000 est. value
Westport, CT 06880

Surf Avenue Multi-Residential
New Construction, Infrastructure
Design
$17,000,000 CJ est. value
Stratford, CT 06615

Langankes Landing
New Construction, Infrastructure - 4,200 SF
Design
$3,000,000 CJ est. value
Shelton, CT 06484

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Sanitary Sewer Contract 75
Infrastructure
Bidding
$200,000 CJ est. value
Westport, CT 06880

Fairfield Hall Site Improvements at WCSU's Midtown Campus
Infrastructure
Post-Bid
Danbury, CT 06810

Upper Veterans Soccer Field Expansion and Renovation
Renovation, Addition
Post-Bid
Sherman, CT

2021 Various Water Main Replacements
Results
Bethel, CT

Central Middle School Backflow Preventer
Results
Greenwich, CT 06830

Playscape
New Construction
Construction
$1,000,000 est. value
Ridgefield, CT 06877

141 Danbury Road Apartments
New Construction, Infrastructure
Construction
$65,000,000 CJ est. value
Wilton, CT 06897

Parklands Drive Apartments
Demolition, New Construction, Infrastructure
Pending Verification
$22,600,000 CJ est. value
Darien, CT 06820

Forest Commons Building
Demolition, New Construction, Infrastructure - 47,700 SF
Pending Verification
$59,000,000 CJ est. value
Fairfield, CT 06824

Oyester Shell Park - City of Norwalk
New Construction
Conception
$250,000 est. value
Norwalk, CT

Last Updated 12/01/2022 01:37 PM
Project Title

Installation Of New Playground Surface & Drainage System At Stillmeadow

Physical Address View project details and contacts
City, State (County) Stamford, CT 06902   (Fairfield County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Park/Playground, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected August 2022 , Construction documents
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of 7/6/2022 all bids rejected and the Owner will rebid this project at a later date. Installation of New Playground Surface and Drainage System at Stillmeadow Elementary School The scope of work includes removal of existing playground surface, installation of new drainage system to be connected to the existing storm sewer system, and to install new pour-in-place surface Bid Deposit 5% Performance & Payment Bond 100% Contact for Technical Questions: Lyudmila Fuks, Clerk of the Works II, (203) 977-4135 or lfuks@stamfordct.gov For questions regarding the purchasing or bidding procedures, call or email Erik J. Larson, Purchasing Agent at (203) 977-4107 or elarson@stamfordct.gov. The City reserves the right, for any reason, to refuse any and all bids submitted under these bid specifications. The City also reserves the right to select the option that it believes is the most beneficial to the City of Stamford. LOCATION AND DESCRIPTION OF WORK The Stillmeadow Elementary School Playground is located at 800 Stillwater Road has a pour-inplace surface that is at the end of its useful life's span. Also, the playground has a brook running through and adjacent to it. Therefore, there is a need for drainage upgrade before the installation of the new playground surface. The playground equipment has been inspected and is in a good condition and for that reason will remain as installed. SCOPE OF WORK The scope of work shall include but is not limited to the following: removal of existing playground surface; installation of a new drainage system that will be connected into the existing storm sewer system; installation of a new pour-in-place surface; repair of safety zones around some existing playground equipment and planting of new shrubs and as specified in the construction drawings and specifications attached in this section.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents