Similar Projects
Arlington - Columbus, STH 22 to Commerce Drive
Infrastructure
Bidding
$9,000,000 to $9,999,999 est. value
Arlington, WI 53911

Regent and Kenosha Culvert Replacement
Infrastructure
Bidding
$300,000 est. value
Madison, WI 53705

2021 South Main Street and Drainage Improvements
Post-Bid
Rice Lake, WI

Storm Drainage for East Campus of Central Wisconsin Center
Infrastructure
Post-Bid
Madison, WI 53704

Fabrication and Installation of Exterior Citywide Wayfinding Signage
Results
Fitchburg, WI

Annual Sidewalk - District 14
Results
$146,500 est. value
Madison, WI

Ogema Prentice Road
Infrastructure
Bidding
$300,000 est. value
Prentice, WI 54556

2021 Miscellaneous Culvert Materials
Term Contract, Infrastructure
Post-Bid
WI

Epoxy Painting - Pavement Marking
Results
Manitowoc, WI

Horse Campground Entrance Road Reconstruction
Infrastructure
Bidding
$482,000 est. value
Campbellsport, WI 53010

2021 Winnipeg Street Drainage Repairs
Infrastructure
Post-Bid
Menasha, WI

Mary Park Fishing Pier
Results
New Richmond, WI 54017

Aluminum Box Culvert - CTH V
Infrastructure
Bidding
Madison, WI

Steel Sign Posts
Term Contract
Post-Bid
WI

Approach Channel Entry and Rescue Upgrades
Results
Milwaukee, WI

Last Updated 07/12/2022 09:02 AM
Project Title

Medford - Prentice, Taylor County Line - CTH a North

Physical Address View project details and contacts
City, State (County) WI   (Price County)
Category(s) Heavy and Highway
Sub-Category(s) Highway Signs/Guardrails/Barriers, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 1,820 CY; Base Aggregate Dense, 13,320 Ton; Marking Tape, 4,850 LF; Marking Epoxy, 245,390 LF; Construction Staking, 79,670 LF; Construction Staking, 2 Each; Construction Staking, 1 LS; Culvert Pipe, 88 LF 24”, 88 LF 30“; Asphaltic Surface, 300 Ton; HMA Pavement, 30,190 Ton; Removing Asphaltic Surface Milling, 270,900 SY; Tack Coat, 19,220 Gals; Adjusting Beam Guard, 225 LF.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents