Similar Projects
Replacement of Bridge No. 05115 - Upland Road over East Aspetuck River
Demolition, New Construction, Infrastructure
Bidding
$2,000,000 CJ est. value
New Milford, CT 06776

Norwalk Transit Major Renovation
Renovation
Bidding
$2,500,000 CJ est. value
Norwalk, CT 06854

Concrete
Infrastructure
Sub-Bidding
$110,000 CJ est. value
Watertown, CT 06779

Farmington High School and FPS Central Office Projects - Bid Package 2.03 Rebid
Renovation
Sub-Bidding
$135,532,699 CJ est. value
Farmington, CT 06032

Slab and Coating Repair (H)
Alteration
Post-Bid
Hartford, CT

Hoist and Concrete Repairs, Stamford Hurricane Barrier
Term Contract, Alteration
Post-Bid
Stamford, CT 06902

Madison Town Hall Concrete Step Project
Results
Madison, CT

General Construction Equipment, Labor and Material Rates
Term Contract, Alteration
Results
Naugatuck, CT

Remediation Services for Crumbling Concrete Foundations
Alteration
Post-Bid
Hartford, CT

Pre-Cast Concrete Dugouts
Infrastructure
Results
$98,500 est. value
Newington, CT 06111

Concrete Pads for Pavilions
Alteration
Post-Bid
Meriden, CT 06450

Demolition and Removal of Existing Concrete Slab and Installation of New Concrete Slab
Alteration
Results
Southington, CT 06489

Old State House Piping Repair
Alteration
Post-Bid
Hartford, CT

Concrete Work and Preparations Dugout Construction
Alteration
Results
Winsted, CT 06098

Signage and Site Concrete - North Branford High School Project
Infrastructure, Alteration
Post-Bid
$1,200,000 est. value
North Branford, CT 06471

Last Updated 11/22/2022 03:08 PM
Project Title

Farmington High School and FPS Central Office Projects - Millwork, Acoustical & Drywall Package

Physical Address View project details and contacts
City, State (County) Farmington, CT 06032   (Hartford County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Request for Qualifications, Construction start expected November 2022 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $13,380,948 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

*As of November 22, 2022, construction is underway. BID PACKAGE 2.06 - MILLWORK & LAB CASEWORK - Legere Group, Ltd. - $4,102,800 BID PACKAGE 2.09a - ACOUSTICAL (NEW HS) - H. Carr & Sons, LLC - $1,198,000 BID PACKAGE 2.09b - ACOUSTICAL (RENO) - Central Conn Acoustics, - Inc. $86,648 BID PACKAGE 2.09c - DRYWALL - GDS Contracting Corp. $7,993,500 THE BID DUE DATE FOR THE FOLLOWING BID PACKAGES HAS BEEN EXTENDED TO WEDNESDAY, OCTOBER 19, 2022 @ 10:00 A.M.: 2.06 - MILLWORK & LAB CASEWORK 2.09a - ACOUSTICAL (NEW HS) 2.09b - ACOUSTICAL (RENO) 2.09c - DRYWALL FARMINGTON HIGH SCHOOL AND FPS CENTRAL OFFICES PROJECT NO PLA, Prevailing Wages apply to this project. This project consists of the construction of a new Farmington High School building and renovations of a portion of the existing high school building for high school athletics and FPS Central Offices. The project includes abatement and demolition of the majority of the existing Farmington High School located on the same property after the new building is complete; followed by renovations, construction of tennis courts and completion of sitework. The Work is defined by two State project numbers: 052-0076N for work associated with the Farmington High School (includes new HS building and portion of renovated building) and 052-0077BE for work associated with the FPS Central Offices (other portion of renovated building). Phase 1 of the Farmington High School project, State Project No. 052-0076N: Early Site Enabling has already been awarded and is currently underway. This phase of work consists of the construction of a temporary bituminous parking lot in the field located adjacent to the Farmington Library, the installation of a temporary pedestrian path, temporary fencing and gates, as well as traffic control signage. These bid documents are specific to Phase 2 of the Farmington High School and Phase 1 of FPS Central Office projects, described as follows: Construction of the new Farmington High School; abatement and demolition of the existing High School, renovations of existing high school building after demo (a portion of this renovation area is the FPS Central Offices project), construction of the tennis courts and completion of all remaining sitework improvements. This project consists of the construction of a new approx. 239,500 SF steel-framed building constructed with typical spread footings, structural steel, fireproofed, with CFMF and/or CMU back up wall structure covered with brick veneer and large curtainwall and storefront, and an EPDM roof to complete the building envelope. All new utility services will provide electrical, gas and water from the street to the building. The new building and all adjacent site improvements for parking and drive access will be constructed beginning in November of 2022 and completed in early August of 2024. Following turnover of the new school building, abatement/demolition and renovations of the existing high school building, and construction of the new tennis courts will commence. Abatement and demolition is scheduled to be complete in November 2024, with all renovation work scheduled for completion in March 2025. Final sitework will extend into May 2025.

Details

239,500 SF.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents