Similar Projects
Kingdom Hall of Jehovah's Witnesses
New Construction, Infrastructure - 3,000 SF
Conception
$1,000,000 CJ est. value
Aurora, OH 44202

Prison Land Property Redevelopment
New Construction
Conception
$116,000,000 est. value
Lebanon, OH 45036

R & L Carriers Expansion / Columbiana
Addition, Demolition, Infrastructure, Renovation - 2,400 SF
Design
$10,000,000 CJ est. value
Columbiana, OH 44408

PTTGC America Ethane Cracker Plant
New Construction, Infrastructure
Design
$7,500,000,000 CJ est. value
Shadyside, OH 43947

Bridge Repair
Infrastructure
Bidding
$571,849 CJ est. value
Columbus, OH 43211

Bridge Repair
Infrastructure
Bidding
$571,849 CJ est. value
Columbus, OH 43211

Athletic Complex Project - Mechanicsburg Exempted Village School District
New Construction, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Mechanicsburg, OH 43044

RFQ Design - DSFM Building Renovations and New Training Structure Packages - 2 & 3
New Construction, Renovation, Infrastructure - 7,250 SF
Post-Bid
$2,005,600 CJ est. value
Reynoldsburg, OH 43068

Vayview, Planeview, and Murwood Lift Station Elimination Project
Infrastructure
Results
$3,947,000 CJ est. value
Beavercreek, OH 45434

Redevelopment of Hollister Development Site
Infrastructure
Results
Cincinnati, OH

Montgomery Quarter
New Construction - 192,000 SF
Construction
$150,000,000 est. value
Montgomery, OH 45242

Montgomery Quarter - Public Site Improvements - Sequence 3
Construction
$5,200,000 est. value
Cincinnati, OH 45242

Castings Commerce Park
New Construction, Infrastructure - 815,000 SF
Pending Verification
$100,000,000 CJ est. value
Columbus, OH 43207

Trumbull Energy Center
New Construction, Infrastructure
Pending Verification
$900,000,000 CJ est. value
Lordstown, OH 44481

McNaughten Site
New Construction, Infrastructure
Design
$81,000,000 CJ est. value
Columbus, OH 43213

Last Updated 01/27/2023 08:42 AM
Project Title

Connection to Fulton County Water System - Rebid

Physical Address View project details and contacts
City, State (County) Delta, OH 43515   (Fulton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,192,069 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

In general, the work consists of installing a 16-inch minimum inside diameter water main by horizontal directional drilling and the construction of a meter control building. Neither Owner nor Engineer has any responsibility for the accuracy, completeness or sufficiency of any bid documents obtained from any source other than the source indicated in these documents. Obtaining these documents from any other source(s) may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than directly from the source listed herein may also result in failure to receive any addenda, corrections, or other revisions to these documents that may be issued. Bids must be submitted on the forms bound herein, must contain the names of every person or company interested therein, and shall be accompanied by either a Bid Guaranty and Contract Bond in the amount of 100% of the amount bid with satisfactory corporate surety, or by a certified check on a solvent bank in the amount of not less than 10% of the amount of the Bid, subject to conditions provided in the Instructions to Bidders. The successful bidder will be required to furnish satisfactory Performance Bond and Maintenance and Guarantee Bond in the amount of 100% of the Bid. The Contractor shall be required to pay not less than the prevailing Davis-Bacon Wage Rates issued by the U.S. Department of Labor. Any Bid may be withdrawn prior to the scheduled closing time for receipt of Bids, but no bidder shall withdraw his Bid within 90 days after the actual opening thereof. The Owner reserves the right to reject any or all Bids, waive irregularities in any Bid, and to accept any Bid which is deemed most favorable to the Owner. Technical questions regarding the project should be e-mailed to the Project Manager, Troy M. Brehmer, at Jones & Henry Engineers, Ltd. at tbrehmer@jheng.com

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents