Similar Projects
Beaver Dam Library Improvements
Renovation
Conception
Beaver Dam, WI

Solar Electric - Pinney Library
Renovation, Alteration
Conception
Madison, WI 53714

Appleton Public Library
Renovation, Addition - 120,000 SF
Design
$26,400,000 est. value
Appleton, WI 54911

Racine Public Library Interior
Renovation
Bidding
$1,600,000 to $2,100,000 est. value
Racine, WI 53403

LE Phillips Memorial Library
Renovation, Addition
Post-Bid
Eau Claire, WI

Monona Public Library
Renovation
Post-Bid
Madison, WI

Cross Plains Library Roof Repair and Replacement
Renovation
Results
Cross Plains, WI 53528

McMillan Memorial Library
Renovation
Results
$1,500,000 est. value
Wisconsin Rapids, WI 54494

Brown Deer Road Redevelopment
New Construction
Pending Verification
Bayside, WI 53217

Central Library
New Construction
Post-Bid
Green Bay, WI 54301

Waukesha Public Library
Renovation, Addition
Results
Waukesha, WI 53186

Le Phillips Library - Bp04 Drapery And Track
Renovation, Alteration
Post-Bid
Eau Claire, WI 54701

Wausaukee Library and Community Center
New Construction
Results
Wausaukee, WI

Appleton Public Library CM at Risk RFP
Renovation
Results
Appleton, WI 54911

Superior Public Library Restroom Remodel
Renovation - 460 SF
Results
Superior, WI 54880

Last Updated 02/09/2022 03:31 PM
Project Title

Carnegie-Schadde Memorial Library Expansion and Remodel

Physical Address View project details and contacts
City, State (County) Baraboo, WI 53913   (Sauk County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project is for the construction of an addition to and renovation of the existing library facility. The multi-level addition is 18,636 sf and the remodeling is 13,241 sf. Project includes site development with a parking areas, drives, landscaping and site work. The facility will be constructed with a concrete slab on grade floors, concrete foundations, precast plank and steel bar joist floor structures, steel structural frame, metal stud framing, masonry veneer, metal siding and membrane roofing over steel bar joist/decking. The project has phased construction completion dates in 2023.

Details

31,877 SF - Library - Public, 18,636 SF Addition, 13,241 SF Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents