Similar Projects
Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

"New" County Road 32 (Cliff/117th St) - 32-65 - Dakota County
Infrastructure
Conception
$1,000,000 CJ est. value
Inver Grove Heights, MN 55077

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Vermillion Acres Senior Living
New Construction - 99,300 SF
Design
$30,000,000 est. value
Hastings, MN 55033

I-35W Frontage Trail
Infrastructure
Bidding
$330,000 CJ est. value
Burnsville, MN 55337

Argenta Trail Drainage Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Inver Grove Heights, MN 55077

Saint Croix Bluffs Regional Park - Conference Cottage Demolition
Demolition, Infrastructure
Sub-Bidding
$95,000 CJ est. value
Hastings, MN 55033

Thompson County Park General Site Improvements
Post-Bid
$1,400,000 est. value
West Saint Paul, MN 55118

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

Spring Lake Park Reserve Ravine Stabilization
Infrastructure
Results
Rosemount, MN 55068

Spring Lake Park Reserve (SLPR) Bison Range - Bid Package 2 Site Improvements
Infrastructure
Results
$450,000 est. value
Hastings, MN 55033

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Gateway Housing
New Construction, Infrastructure - 75,899 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Burnsville, MN

Launch Park Lakeville
New Construction, Infrastructure - 1,300,000 SF
Pending Verification
$140,000,000 CJ est. value
Lakeville, MN 55044

Last Updated 08/04/2022 12:09 PM
Project Title

Suite Living Senior Care Of Eagan

Physical Address View project details and contacts
City, State (County) Eagan, MN 55122   (Dakota County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Assisted Living Facility, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $9,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of 32 unit assisted living and memory care facility. As of August 4, 2022, this project is in the early planning stages, and received recommendation of approval from the Eagan Planning Commission for rezoning, preliminary subdivision and preliminary planned development. An architect and a general contractor have been selected. A firm timeline has not been announced, however, construction is unlikely to begin prior to first quarter of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Apartments, 32 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents