Similar Projects
Geologic Maintenance / Slide Repair
Infrastructure
Conception
$1,200,000 CJ est. value
Newark, OH 43055

Roadway Minor Rehab
Infrastructure
Conception
$4,535,000 CJ est. value
Newark, OH 43055

Canal Crossing
New Construction, Infrastructure
Design
$11,222,000 CJ est. value
Chatham, OH 43055

US 35/US 23 - Bridge Repair
Infrastructure
Bidding
$421,000 CJ est. value
Jacksontown, OH 43056

Union Township Road Resurfacing and Maintenance Project
Infrastructure
Bidding
$150,000 CJ est. value
Hebron, OH 43025

Ohio Department of Agriculture - New Animal Disease Diagnostic Lab
New Construction, Infrastructure
Post-Bid
$71,730,000 CJ est. value
Reynoldsburg, OH 43068

Waterline Extensions River Road Phase 1 Weaver Drive Phase 2
Infrastructure
Post-Bid
$280,000 CJ est. value
Granville, OH 43023

National Road Wellfield Well 8 and 9 Development project
Infrastructure
Results
$275,000 est. value
Pataskala, OH 43062

Lead Water Service Replacement Project
Infrastructure
Results
$698,074 CJ est. value
Newark, OH 43055

Amazon Web Services - 3rd Data Center / New Albany
New Construction, Infrastructure - 170,000 SF
Pending Verification
$400,000,000 CJ est. value
New Albany, OH 43031

Green Chapel Road from 62 to Clover Valley Road - Ohio Department of Transportation
Infrastructure
Pending Verification
$19,500,000 CJ est. value
Johnstown, OH 43031

Liberty Township Administration Building Project
New Construction, Infrastructure
Bidding
$1,500,000 CJ est. value
Johnstown, OH 43031

RFQ Construction Manager at Risk Services - Johnstown WTP Expansion Project
Addition, Demolition, Infrastructure
Post-Bid
$14,000,000 CJ est. value
Johnstown, OH 43031

2023 Asphalt Resurfacing of Various County Roads -Phase 1
Infrastructure
Results
$5,073,948 CJ est. value
Newark, OH 43055

Beech Road from Innovation Corridor Way to Jug Street - Ohio Department of Transportation
Infrastructure
Pending Verification
$9,300,000 CJ est. value
New Albany, OH 43062

Last Updated 07/06/2023 02:31 PM
Project Title

Intel Silicone Heartland Chip Factory Development - Phase 1

Physical Address View project details and contacts
City, State (County) Jersey Township, OH 43031   (Licking County)
Category(s) Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Site Development
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $1,500,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a $20 billion manufacturing complex on nearly 1,000 acres. Phase 1 will consist of 2.5 million square feet of factory space, including 600 thousand square feet of cleanrooms. Further scope and phasing information has not been released. As of May, 2023,, excavation work has been completed and foundation concrete is being poured for Phase 1. A timeline for vertical construction has not been established as of yet.* *This development is being funded by the CHIPS Act.

Details

2,500,000 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents