Similar Projects
SR 1011 over Fowler Run Box
Infrastructure
Conception
$881,270 CJ est. value
Eldred, PA 16731

Gates Hollow
Infrastructure, Renovation
Conception
$2,257,417 CJ est. value
Bradford, PA 16701

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

SR 1003 - Brady Twp Line to SR 1001
Infrastructure
Design
$2,899,132 CJ est. value
Henderson Township, PA 16652

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

T-308, T-311 - Milling of Bituminous Paving, Warm Mix Asphalt (WMA) Binder Course and Wearing Course
Infrastructure
Post-Bid
$300,000 CJ est. value
Hamilton Township, PA 16740

New Waste Water Treatment Plant
Demolition, New Construction, Infrastructure
Results
$14,683,125 CJ est. value
Eldred, PA 16731

Kiasutha Recreation Area Redevelopment Phase I, Allegheny National Forest
Demolition, Infrastructure, Renovation
Results
$329,900 CJ est. value
Hamilton Township, PA 16735

Dollar General / Duke Center
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Duke Center, PA 16729

Foster Brook Box
Infrastructure, Renovation
Conception
$974,053 CJ est. value
Bradford, PA 16701

Alleghenyville Road (SR 3024) over I-176
Infrastructure
Design
$4,171,810 CJ est. value
Brecknock Township, PA 19540

Pavement Restoration
Infrastructure
Post-Bid
$300,000 CJ est. value
Smethport, PA 16749

Ridge Top Road Stormwater Improvements
Infrastructure
Results
$42,721 CJ est. value
Eldred, PA 16731

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

SR 246 Baker Run
Infrastructure, Renovation
Design
$2,474,000 CJ est. value
Bradford, PA 16701

Last Updated 09/27/2023 02:04 PM
Project Title

Sewer & Water System Replacements Project

Physical Address View project details and contacts
City, State (County) Eldred, PA 16731   (McKean County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $6,680,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the replacement of approximately 9,650 lineal feet of conventional gravity sewer main, manholes, laterals and 2 pumping stations along with the necessary appurtenances. The water phase includes the replacement of approximately 9,600 lineal feet of water main, fire hydrants, air release manholes, service connections, along with the necessary appurtenances. A certified check or bank draft, payable to the order of the Owner or negotiable U.S. Government Bonds (at par value), or a satisfactory Bid Bond on the form provided, executed by the Bidder and an acceptable surety (Surety companies must appear on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania), in an amount equal to ten percent (10%) of the total of the Bid shall be submitted with each bid to guarantee the Bidder's entrance into a contract if given the award. No bid bond shall be waived or returned because the Bidder has failed to or cannot comply with any requirements set forth in the plans, specifications or any applicable statutes of the Commonwealth of Pennsylvania, or any applicable municipal ordinances. The successful bidder will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price and Highway Restoration Bond on the forms provided, with a surety company listed on the Treasury Department's most current list (Circular 570 as amended) and be authorized to transact business in the State of Pennsylvania. The DBE solicitation process does not require you to hire a certain number of DBE firms and does not have goals. This project is being federally funded by EPA financial assistance dollars and therefore requires all contractors to demonstrate compliance with federal Executive Orders 11625, 12138, and 12432 and EPA Regulations at 40 CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents