Similar Projects
Water Main Replacement: Eldorado/Seville - W2 -18 - Village of Bellevue
Infrastructure
Conception
$650,000 CJ est. value
Bellevue, WI 54302

Josten North East Restrooms/Pavilion - LS19 - Village of Bellevue
New Construction, Infrastructure
Conception
$386,640 CJ est. value
Green Bay, WI 54311

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Bayside Machine Corporation Expansion
Addition, Demolition, Infrastructure, Renovation - 27,680 SF
Design
$10,000,000 CJ est. value
De Pere, WI 54115

Pond and Drainage System Construction
Infrastructure
Bidding
$264,024 CJ est. value
De Pere, WI 54115

Pond and Drainage System Construction
Infrastructure
Bidding
$264,024 CJ est. value
De Pere, WI 54115

Culvert Replacement and Hot Oil Chip Sealing
Post-Bid
WI

Crackfilling
Infrastructure
Post-Bid
De Pere, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Road Improvement
Infrastructure
Results
Denmark, WI 54208

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

University Heights at Baird Creek
New Construction, Infrastructure
Pending Verification
$24,600,000 CJ est. value
Green Bay, WI 54311

Oak Park Drive Streambank Stabilization - ST26-01 - Village Of Bellevue
Infrastructure
Conception
$323,000 CJ est. value
Bellevue, WI 54311

Last Updated 03/29/2023 10:02 AM
Project Title

Culvert Replacement and Road Repair

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54301   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $130,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of the existing culverts, curb and gutter, asphalt pavement and unclassified excavation. Installation of new culverts (12-inch to 24-inch x 38-inch), apron endwalls, new gravel base, asphalt pavement, curb and gutter and restoration. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsins 46 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements 47 on state building projects no longer apply. These changes take effect for projects 48 advertised for bid after September 23, 2017. This change does not affect the Federal 49 Davis Bacon Act requirements. A pre-bid meeting will NOT be held. This project involves the removal of the existing culverts, curb and gutter, asphalt pavement and unclassified excavation. Installation of new culverts (12-inch to 24-inch x 38-inch), apron endwalls, new gravel base, asphalt pavement, curb and gutter and restoration. . The project is located on the north end of the University Of Wisconsin Green Bay campus at the intersection of E Circle Drive and Scottwood Drive/CTH I.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents