Similar Projects
Hoods and Duct Cleaning Maintenance and Repair PASFB
Term Contract
Bidding
Patrick AFB, FL

HVAC Water Treatment Services and Supplies
Alteration
Bidding
Viera, FL

BPS Longleaf Elementary School Chiller
Post-Bid
Melbourne, FL 32935

Brevard Public Schools Locker Room HVAC Projects
Post-Bid
Melbourne, FL 32901

Construct HV Duct Bank, Trident MACA
Results
$1,000,000 to $5,000,000 est. value
Cape Canaveral, FL 32920

Fire Station Air Purification Systems
Results
$240,000 est. value
Melbourne, FL 32935

HVAC and Mechanical Products
Term Contract
Post-Bid

Replace Chiller Bldg 1317
Results
Patrick AFB, FL 32925

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement
Post-Bid
$1,000,000 to $5,000,000 est. value
FL 32899

HVAC Services and Repair
Term Contract
Results
Viera, FL 32940

Gemini ES CEP Upgrades
Post-Bid
Melbourne Beach, FL 32951

Repair HVAC System, Bldg 3656, PAFB
Results
Patrick AFB, FL 32925

Brevard (Viera) CHD - Chiller Replacement
Post-Bid
Viera, FL

Replace HVACS-Canaveral Nat'L Seashore, FL
Results
Titusville, FL 32796

Air Conditioning Unit Replacement - D.B. Lee Water Reclamation Facility
Alteration
Post-Bid
Melbourne, FL 32935

Reported 06/09/2021 12:00 AM
Project Title

Logistics Facility Heating, Ventilation and Air Conditioning (HVAC) Replacement, Kennedy Space Center, Fl.

Physical Address View project details and contacts
City, State (County) Cape Canaveral, FL   (Brevard County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Demolition of existing roof top units, modification of existing ductwork, install and upgrade Variable Air Volume units, upgrade Constant Air Volume units, upgrade controls and remote monitoring, demolition of existing chilled water pumps, modification of chilled water piping, incorporate variable frequency drive pump motor controls, demolition and replacement of computer room units and air cooled condensers, upgrade of existing Andover Continuum Building Automation System hardware/firmware and software and incorporate remote monitoring, demolish and replace existing roof curbs for all rooftop equipment to be replaced, demolish existing supply ventilation fans and relief ventilators and replace with new equipment to meet code ventilation requirements, demolish and replace with like in kind exhaust fans.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents