Similar Projects
AI Influent Pump Station Improvements
New Construction
Design
Less than $2,900,000 est. value
Saint Augustine, FL 32080

Westside Water Reclamation In-Plant Pump Station and Headworks - Design-Build
Design
$18,000,000 to $20,000,000 est. value
Daytona Beach, FL

Lift Station No. 42 Replacement
Renovation
Bidding
Saint Petersburg, FL 33716

Lift Station B-03 Rehabilitation
Renovation
Bidding
$489,794 est. value
Melbourne Beach, FL 32951

DSSC Building Interior Planter Infill Tennis Center Lift Station
Renovation
Sub-Bidding
Tampa, FL 33614

Paradise Village Lift Station
New Construction
Post-Bid
Jacksonville, FL 32220

Improvements To Lift Stations 393, 1023 And 8168
Renovation
Post-Bid
Belle Glade, West Palm Beach, FL

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Master Lift Station X8
New Construction
Results
Immokalee, FL 34142

Mid-County Master Lift Station Replacement
Construction
Dunedin, FL 34698

Cedar Bay District II Pump Stations and Flow Rerouting Project - Robena Road
Construction
Jacksonville, FL 32218

Bayshore Yacht Basin Relocation and Force Main Replacement
New Construction
Bidding
$3,092,000 est. value
Bradenton, FL 34207

Construction of Lift Station 1 Relocation
New Construction
Post-Bid
Maitland, FL

4511 Spring Park Road Pump Station Rehabilitation and Upgrade
Results
Less than $5,000,000 est. value
Jacksonville, FL 32207

Rehab of LS 54 and LS 65
Renovation
Construction
Clearwater, FL 33759

Reported 04/16/2022 12:00 AM
Project Title

Storm Water Pump Station Repair and Rehabilitation Services, Countywide

Physical Address View project details and contacts
City, State (County) FL   (Hillsborough County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,292,029
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To rehabilitate stormwater pump stations throughout the County. Work will include general maintenance, minor and major repairs to stormwater pump stations for associated work needed and the Contractors shall furnish materials, equipment, and labor

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents