Similar Projects
Last Updated | 09/02/2022 03:36 AM |
Project Title | Green Hills Elementary School HVAC |
Physical Address | View project details and contacts |
City, State (County) | Pine Mountain, KY 40810 (Harlan County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $230,000 [brand] Estimate |
Plans Available from | Copy Center |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 2110 Furnish all labour and materials to complete the Green Hills Elementary School HVAC, located at 123 Kentucky 221, Bledsoe, KY 40810. Work is to be performed in accordance with plans, specifications, and addenda prepared by Summit Architectural Services (ARCHITECT), and Shrout Tate Wilson Engineers (M/E ENGINEER). In addition to requirements of KRS 45A, this project is partially funded by ESSER II funds, which require the general procurement standards of 2 C.F.R. 200.318, including Federal Prevailing Wages required by the Davis-Bacon Act. Adherence to the wages will be applicable, including weekly submittal of certified payroll reports. The Owner reserves the right to reject any or all bids and to waive all informalities and/or technicalities where the best interest of the Owner can be served. Bid opening will be public, and contracts will be with the Owner. Bids from Small Business Enterprises (SBE, MBE, WBE, VOSB, etc.) are encouraged and supported. The bid will be submitted in duplicate on copies of the Form of Proposal located in the Volume One Project Manual Bidding and Contract Documents. Both copies of the Form of Proposal and Bid Bond shall be placed in a manila envelope and have the Project Name and Proposed Bid Package number affixed. No Bidder may withdraw a bid submitted for a period of sixty (60) days after the date set for the opening of bids. The Project Schedule will be issued via addendum. The contract will include liquidated damages assessed at $1,000.00/day if the completion date is not met. Successful Bidders are required to furnish a 100% Performance and Labor and Material Payment Bond for this Project. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |