Similar Projects
Gateway Middle School - Additions & Renovations (Roofing Construction)
Bidding
Monroeville, PA 15146

On-Call General Construction and Roofing
Bidding
Pittsburgh, PA

Sewage Treatment Plant (Secondary Process Building) Roof Replacement
Post-Bid
Tarentum, PA 15084

Energy Plant/Power Substation Roof Replacement - (General)
Post-Bid
West Mifflin, PA 15122

Roof Repair on Communications Building 405
Results
$100,000 to $250,000 est. value
Coraopolis, PA

Low-Slope EPDM Roof Replacement at Clairton Municipal Building
Results
Clairton, PA 15025

Old Conservatory West Wing Roof Restoration and Replacement
Renovation
Construction
$162,431 est. value
Pittsburgh, PA 15123

Congregation Beth Shalom Roofing and Solar Project
Renovation
Construction
Pittsburgh, PA 15217

Roof Renovations
Bidding
Jefferson Hills, PA

Roof Replacement for Selected Middle School Roofs
Post-Bid
Pittsburgh, PA 15219

Roofing and Mechanical Upgrades at Manchester, East Liberty, and West Mifflin Garages
Results
$1,000,000 to $6,000,000 est. value
PA

Elizabeth Seton Center Roof Replacement
Construction
Pittsburgh, PA 15226

CITF GEDF McKeesport Heritage Center Roof Replacement Project
Post-Bid
Pittsburgh, PA

Roof Replacement for Historic Thornburg School Building
Results
Less than $250,000 est. value
Thornburg, PA

Holy Family Institute Main Building Roof Replacement
Renovation
Post-Bid
Pittsburgh, PA 15202

Last Updated 12/10/2019 03:53 PM
Project Title

Allegheny L/D No. 2, Replace Operations Building Powerhouse Roof

Physical Address View project details and contacts
City, State (County) Pittsburgh, PA 15206   (Allegheny County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $25,000 to $100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Operations Building Powerhouse Roof - Remove the existing roofing materials down to teh concrete deck, roof drains, insulation, vent covers, and gravel stop from an approximately 1,700 square foot building and dispose of properly. Install a new air/vapor barrier on concrete deck and adhere one layer of 3.5-inch Polyiso insulation. Install a new, fully adhered, 60 mil EPDM roofing system, conforming to ASTM D4637/D4637M, with a new flashing system around the perimeter and all roof top penetrations. The roofing system shall have new roof drain inserts equivalent to Firestone TIS #1513, new tapered insulation minimum thickness of 1 inch and the roof shall have a 1/4 inch drop per foot towards the roof drains, and include the addition of any features to ensure positive drainage towards the roof drains. New flashing shall be installed on pipe vents protruding from roof surface. New vent cover and caps shall be installed on the generator exhaust pipe. THe existing lights and electric conduit, junction boxes, etc. shall be relocated only if necessary. Once altered, they must be placed back on the new roof in fully working condition and to appropriate codes. Though the cameras have been removed, the camera systems' mounting plates need to be permanently removed so the flashing can be placed in these areas - see pictures.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents