Similar Projects
Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Sixth Street, Hampshire To Vermont Streets - 15709 - City of Quincy
Infrastructure
Design
$4,270,000 CJ est. value
Quincy, IL 62301

Municipal Landfill No. 4 2023 Gas Header Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Quincy, IL 62305

Municipal Landfill No. 4 2023 Gas Header Improvements
Infrastructure
Bidding
$200,000 CJ est. value
Quincy, IL 62305

Annual Hma Resurfacing Program
Term Contract
Sub-Bidding
$500,000 CJ est. value
Quincy, IL 62301

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

HMA Surface Removal and Replacement at the I-172 and IL 57 Interchange Ramps
Infrastructure
Results
IL

2022 - 7th Ward Capital Improvements (MR 658) Project
Infrastructure
Results
$2,000,000 est. value
Quincy, IL

Quincy Medical Group Hospital
New Construction, Infrastructure - 68,000 SF
Pending Verification
$61,142,058 CJ est. value
Quincy, IL 62301

Quincy Regional Airport - New Apron, Taxi Lane, and Road
New Construction, Infrastructure
Design
$2,400,000 CJ est. value
Quincy, IL 62305

2023 Alley and Capital Improvements
Infrastructure
Bidding
$1,000,000 CJ est. value
Quincy, IL 62301

Concrete Replacement Work at Indian Hills (IL 16-1)
Infrastructure
Post-Bid
$130,000 CJ est. value
Quincy, IL 62301

Rock Excavation on I-172
Infrastructure
Results
$500,000 est. value
Quincy, IL 62328

2023 Motor Fuel Tax Asphalt Resurfacing
Infrastructure
Bidding
$400,000 CJ est. value
Quincy, IL 62301

Last Updated 12/13/2023 09:04 AM
Project Title

Phase 3 Water Supply Improvement Project

Physical Address View project details and contacts
City, State (County) Quincy, IL 62301   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Accepting Letters of Interest, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.wgem.com/2022/11/15/going-back-drawing-board-phase-3-water-supply-improvement-projects-after-budgeting/ - Engineers are ready to start work on Phase 3 of Quincy's water supply improvement project. This comes after Quincy City Council approved about $137,000 Monday night to redesign the project. Quincy Public Works Director Jeffrey Conte said bids for the original design came in at $12.4 million, but the budget came in at $7.5 million. Conte said no minor changes would be possible to get it to fit back into the budget, so they started the redesign process in June. He said the goal now is to move everything in the building to higher floors and use wet flood-proof materials. "Then we're going to design the building, to allow it to flood," Conte said. "Essentially it would fill up with water and then when the flooding recedes it would drain out. Basically, what you do, everything would need to be built out of flood-proof materials which is brick and masonry construction. So that's not a problem." Conte said engineers are ready to start immediately. He hopes to have the design done by this calendar year, so they can go out to bids again in mid-winter. ______________________________________________________________________________ As of June 17, 2022, bids received were rejected. Project will rebid but no definite date yet. The project includes construction of new raw water and treated water pump stations, including construction of new reinforced concrete structures and modification and rehabilitation of existing structures; furnishing and installing vertical turbine pumps, piping, chemical feed pumps, electrical switchgear and electrical control systems, chemical storage tanks and appurtenances; demolition of existing structures; filling and grading the site; construction of pavements; and associated work. This procurement is also subject to the loan recipient's policy regarding the increased use of disadvantaged business enterprises. The loan recipient's policy requires all bidders to undertake specified affirmative efforts at least sixteen (16) days prior to bid opening

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents